Loading…
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2 LQualified Make: LOKOZO
Model: LI FI 1.1 FLAT NO 16A NH 727BB COMMON SERVICE CENTRE RUDRAPUR BHALUHI RUDALAPUR BHALUHI MAHARAJGANJ RUDALAPUR BHALUHI MAHARAJGANJ | Make: LOKOZO
Model: LI FI 1.1 | L1 | Qualified | |
| 2 | L2₹2.7 L+₹74,950 (37.5%)Qualified Make: Lens Point
Model: LPELBBA FCA 258 ASCENTECH LIGHTNING SOLUTION MUKESH COLONY SECTOR 1 BALLABHGARH FARIDABAD HARYANA 121004 | FARIDABAD | HARYANA | 121004 | Make: Lens Point
Model: LPELBBA | L2 | Qualified | |
| 3 | L3₹3.7 L+₹1.7 L (84.8%)Qualified Make: NA
Model: SWADESH204 KH NO 385 3RD FLOOR 100 FT ROAD 100 FT ROAD GHITORNI SOUTH WEST DELHI DELHI 110030 | SOUTH DELHI | DELHI | 110030 | Make: NA
Model: SWADESH204 | L3 | Qualified | |
| 4 | L4₹3.8 L+₹1.8 L (87.5%)Qualified Make: Navitas Lighting
Model: NAV-PEL-IWB200 PLOT NO 17 NAVNATH SOCIETY MASKE LAYOUT NARENDRA NAGAR NAGPUR NAGPUR MAHARASHTRA 440015 | NAGPUR | MAHARASHTRA | 440015 | Make: Navitas Lighting
Model: NAV-PEL-IWB200 | L4 | Qualified MSE, Category: General | |
| 5 | L5₹4.8 L+₹2.8 L (140.0%)Qualified Make: GVE
Model: D1 14 1 LORDGUNJ LORDGUNJ LORDGUNJ JABALPUR MADHYA PRADESH 482002 | JABALPUR | MADHYA PRADESH | 482002 | Make: GVE
Model: D1 | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
6 Jan 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Emergency lighting and accessories (Portable Emergency Lighting System Tower type with Battery Bank) (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048488 Dated : 27-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8767600
GEM/2025/B/7048488
Two Packet Bid
Emergency lighting and accessories (Portable Emergency Lighting System Tower type with Battery Bank) (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller Experience Criteria
15 days
MEERUT
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
80%
Exempted
6 Jan 2026
27 Dec 2025
6 Jan 2026
Emergency lighting and accessories (Portable Emergency Lighting System Tower type with Battery Bank) (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048488 Dated : 27-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8767600.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .