Superintending Engineer (PMGSY) MRRDA, Pune Region
Superintending Engineer (PMGSY), Maharashtra Rural Road Development Association, Pune Region Pune, Block No. 306, 3rd Floor, New Administrative Building, Opp. Council Hall, Camp, Pune - 411 001
Package NO. ADB (II) SAT-BR-02 Tal. Man, Dist. Satara Total 06 Bridge Work
2025_MRRDA_1258136_2
E-Tender No.13/2025-26 Bridge
Open Tender
Civil Works - Bridges
Lump-sum
545 days
Satara
As per Tender
8 documents required · 8 mandatory
₹17,700
₹3.6 L
Superintending Engineer (PMGSY) MRRDA, Pune Region
12 Dec 2025
11 Dec 2025
22 Dec 2025
11 Dec 2025
18 Dec 2025
11 Dec 2025
15 Dec 2025
1) Construction of bridge across local nalla at Chainage 4/800 km on Bijwadi to rajwadi to Danvlewadi Bridge Road Tal-Man, Dist-Satar Package No-ADB(II)-SAT-BR-02
Design and Construction of Major Submersible Bridge of 36 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on BIJWADI side is 33 m DANVLEWADI SIDE 35M both side and approch road is 68 meter having 4 SPANs of 9 metre.
2) Construction of bridge across local nalla at Chainage 1/150km on Bijwadi to rajwadi to Danvlewadi Bridge Road Tal-Man, Dist-Satara Package No-ADB(II)-SAT-BR-02
Design and Construction of Major Submersible Bridge of 20 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on BIJWADI side is 52 m DANVLEWADI SIDE 41M both side and approch road is 93 meter having 2 SPANS of10 metre.
3)Construction of Bridge on Pingli Bk to Phadtarewasti at Ch-0+280 Tal.-Man _Dist. Satara, Package No-ADB(II)-SAT-BR-02
Design and Construction of Major Submersible Bridge of 20 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on PINGLI BK.side is 44 m PHADTREWASTI SIDE 45 m both side and approch road is 89 meter having 2 SPANS of10 metre.
4) Construction of Minor Submergible bridge across local nalla at Chainage 0/400 km on Bijawadi to Rajwadi to Danwalewadi Road Tal-Man Dist-Satara Package No-ADB-(II)-SAT-BR-17
Design and Construction of Major Submersible Bridge of 18 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on BIJWADI side is 53 m DANVLEWADI SIDE 40M both side and approch road is 93 meter having 3 SPANS of 6 metre.
5) Construction of Minor Submergible bridge across local nalla at Chainage 0/200 km on Bijawadi to Rajwadi to Danwalewadi Road Tal-Man Dist-Satara Package No-ADB(II)-SAT-BR-02
Design and Construction of Major Submersible Bridge of 21 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on BIJWADI side is 45 m DANVLEWADI SIDE 44M both side and approch road is 89 meter having 3 SPANS of 7 metre.
6) Construction of Bridge on SH 47 TO DADSAWADA AT CH- 0-880 Tal.- MAN _Dist. Satara, Package No-ADB(II)-SAT-BR-02
Design and Construction of Major Submersible Bridge of 22.50 metre length satisfying the various from and requirements included in the document and height RTL to the base of the foundation as shown in the Departmental design, drawing and described in the scope of work. Including well foundation / pile foundation / open foundation as per the design. All other provisions for sub structure, superstructure, railing, wearing coat and Box returns / Solid returns of required length and depth to be considered as per Detail / Design Criteria attached with Tender Document. With approach structure as per departmental design and drawing and Road etc. complete. Approach structure to be constructed with RCC returning wall structure on YELEWADI side is 40m DADSWADA SIDE 65 M both side and approch road is 105 meter having 3 Spans of 7.50 metre.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
SBDADBIISATBR02.pdf
Tender Documents • 3.61 MB
dataADBIISATBR02.rar
Other Document • 6.34 MB
BOQ_2168567.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .