Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 CrAccepted-AOC 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | L1 | Accepted-AOC AOC |
Tender Value
₹45.1 Cr
EMD Value
₹22.6 L
Closing Date
3 Mar 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer (PMGSY), MRRDA, Pune
Superintending Engineer (PMGSY), MRRDA, Pune
KOLA279-1.Rukadi 2. Mangaon 3.Udgaon 4.Rui to Sajani 5. Kumbhoj to Durgewadi 6. Babu Jamal Darga 7. Mhasoba Devalay 8.Khochi 9.Narande 10.Pattankodoli Tal. Hatkanangale Dist.Kop
2025_MMGSY_1147238_1
SE/PMGSY/13/2024-25(5th Call)
Open Tender
Civil Works - Roads
Percentage
730 days
Kolhapur
Please refer Tender documents.
8 documents required · 8 mandatory
₹29,500
₹22.6 L
Superintending Engineer (PMGSY), MRRDA, Pune
9 May 2025
10 Feb 2025
5 Mar 2025
10 Feb 2025
3 Mar 2025
10 Feb 2025
14 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Proposed Upgradation/ Improvement and Maintenance of road from SH 194 Rukadi to MDR-21 Rui Km 0/000 to Km 2/100 & Km 5/200 to Km 8/300 Tal- Hatkanangale, Dist-Kolhapur. | |||||
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned,up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as perTechnical Specification Clause 201. As Directed By Engineer Incharge | 1.66 | Hector | 27,857.35 | ₹46,243.2 |
| - | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. As Directed By Engineer Incharge | 13,162.5 | Sqare meter | 16.6 | ₹2,18,497.5 |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. As Directed By Engineer Incharge | 34.76 | Cubic Meter | 630.9 | ₹21,930.08 |
| - | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. As Directed By Engineer Incharge | 30 | Running Meter | 617.5 | ₹18,525 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 As Directed By Engineer Incharge | 3,356.2 | Cubic Meter | 88.05 | ₹2,95,513.41 |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 As Directed By Engineer Incharge | 7,538.49 | Cubic Meter | 670.45 | ₹50,54,180.62 |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 As Directed By Engineer Incharge | 5,656.77 | Cubic Meter | 77.65 | ₹4,39,248.19 |
| - | Removal of Unsuitable Soil and Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 As Directed By Engineer Incharge | 2,513.39 | Cubic Meter | 77.65 | ₹1,95,164.73 |
| - | Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 As Directed By Engineer Incharge | 754.02 | Cubic Meter | 114.1 | ₹86,033.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1997131.xls
BOQ • 0.64 MB
162969400.pdf
Tender Documents • 0.13 MB
162969401.html
Tender Documents • 0.06 MB
164252457.pdf
Tender Documents • 0.36 MB
164252458.html
Tender Documents • 0.01 MB
KOLA279.rar
Tender Documents • 36.71 MB
SBD.pdf
Tender Documents • 2.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .