Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹12.7 L+₹74,033.14 (6.22%)Rejected-Finance SIMALUGURI TOWN WARD NO 2 SIVASAGAR ASSAM 785686 | SIMALUGURI | SIVASAGAR | ASSAM | 785686 | ₹12.7 L+₹74,033.14 (6.22%) | L2 | Rejected-Finance L2 bidder |
| 3 | Not Admitted-Fee/PreQual/Technical NAGAMATI KHEREMIA VILLAGE NAMRUP ROAD PARBATPUR DIBRUGARH 786623 | DIBRUGARH | ASSAM | 786623 | - | - | Not Admitted-Fee/PreQual/Technical Others-The bid is not admitted due to non-submission of requisite Earnest Money deposit as specified in bid document |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder has not submitted Audited Financial Statements (Balance Sheet and P/L Statement) for FY 2023-24 |
| Sl No | Description | Qty | Unit | HIMANSHU BHUYAN L1 | krishna borah L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | 14.5 | cum | 200 ₹3,422 | 100 ₹1,711 Lowest |
| 2.00 | Providing and laying in position cement concrete of 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) grade excluding the cost of centering and shuttering all work up to plinth level.Brand-STAR/DALMIA/ULTRATECH | 12.03 | cum | 4,590 ₹65,173.13 Lowest | 5,100 ₹72,414.59 |
| 3.00 | Steel reinforcement of Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | 1,418.18 | kg | 90 ₹1,50,610.93 | 75 ₹1,25,509.11 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 8 | sqm | 300 ₹2,832 Lowest | 400 ₹3,776 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers. | 45.6 | sqm | 300 ₹16,142.4 Lowest | 550 ₹29,594.4 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 38.48 | sqm | 300 ₹13,621.92 Lowest | 600 ₹27,243.84 |
| 7.00 | Providing and laying in position 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement all work up to plinth level. | 19.7 | cum | 8,520 ₹1,98,065.97 | 8,100 ₹1,88,302.16 Lowest |
| 8.00 | Steel reinforcement of Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Brand- TATA/SAIL/JSW/SHYAM | 451.05 | kg | 90 ₹47,901.09 | 75 ₹39,917.57 Lowest |
| 9.00 | Reinforced cement concrete of 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)grade for work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, ;KAshuttering, finishing and reinforcement. Brand-STAR/DALMIA/ULTRATECH | 3.78 | cum | 8,520 ₹38,002.61 | 8,100 ₹36,129.24 Lowest |
| 10.00 | Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20mm nominal size derived from natural sources). | 12 | sqm | 580 ₹8,212.8 | 240 ₹3,398.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,400
Closing Date
8 Sept 2025, 4:00 pmClosed
General Manager, NTPS, APGCL
O/O The General Manager, NTPS, APGCL, Namrup, Dibrugarh District
Construction of Assam type building for Transformer Oil Filtration Unit at NTPS
2025_APGCL_46592_1
11 of 2025
Open Tender
Civil Works - Building
Item Rate
50 days
Namrup Thermal Power Station, Namrup, APGCL
Annual Turnover, CA certified Net Worth, PAN, Active GST Registration certificate, Registration certificate of firm (if any), Labour License, E.P.F, List of similar works previously executed, ESIC, Valid Contractor license, Bank solvency
3 documents required · 3 mandatory
₹300
₹29,400
Yes
30 Oct 2025
16 Aug 2025
9 Sept 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .