Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.0 LAccepted-AOC AT BIJAIN POST BAHERA P S BACHRA DISTT CHATRA JHARKHAND | CHATRA | JHARKHAND | 825103 | ₹45.0 L | L1 | Accepted-AOC Quoted rate is same as evaluated rate |
| 2 | Rejected-Technical | - | - | Rejected-Technical unsuccessful not being lowest bidder |
| 3 | Rejected-Technical AT BENTI POST BAHERA P S PIPARWAR DISTT CHATRA JHARKHAND | - | - | Rejected-Technical unsuccessful not being lowest bidder |
Tender Value
₹45.0 L
EMD Value
₹56,300
Closing Date
4 Apr 2026, 11:00 amClosed
Staff Officer (Civil), PPR Area
GM OFFICE PPR AREA
Renovation and protection works of pond near community center in Bijain R and R site under Ashok OCP, Piparwar Area.
2026_CCL_357445_1
GM(PPR)CivilEtender/25-26/2897
Open Tender
Civil Works - Others
120 days
R and R site
AS PER NIT
3 documents required · 3 mandatory
₹56,300
19 May 2026
24 Mar 2026
6 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
25 Mar 2026 - 1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | PART A POND Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manualmeansoverareas(exceeding30cmindepth,1.5m inwidthaswellas10sqmonplan) includinggettingoutanddisposalofexcavatedearthleadupto50mandforall lift,asdirected by Engineer-in-charge.All kinds of soil | 1 | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | - |
| 1.03 | Providing and laying in position cement concrete ofspecifiedgradeexcludingthecostofcenteringandshuttering-Allworkup
to plinth level :1:4:8(1Cement :4coarsesand(zone-Ill)derivedfromnaturalsources:8gradedstoneaggregate40mmnominalsizederivedfrom natural sources) | 1 | cum | - | - | - |
| 1.04 | Random rubble masonry with hard stone infoundation and plinth including levelling upwith cement concrete1:6:12 (1cement :6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6(1 cement :6 coarse sand | - | cum | - | - | - |
| 1.05 | Providingand laying inpositionspecifiedgrade of reinforcedcement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1cement:1.5coarsesand(zone-Ill) derived from natural sources :3gradedstoneaggregate20mmnominal sizederived
from natural sources) | - | cum | - | - | - |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting,bending,placinginpositionandbindingallcompleteupto
plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | kG | - | - | - |
| 1.07 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. | - | sqm | - | - | - |
| 1.08 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Flush/ Ruled pointing | - | sqm | - | - | - |
| 1.09 | Fillingavailableexcavatedearth (excluding rock) in trenches, plinth, sidesof foundationsetc. in layersnot exceeding20cmin
depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | - | Cum | - | - | - |
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | - | sqm | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_370309.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_370309.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid