| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr | 1 | Accepted-AOC Lowest bid |
| 2 | 2₹1.8 Cr+₹2.9 L (1.63%)Rejected-Finance | ₹1.8 Cr+₹2.9 L (1.63%) | 2 | Rejected-Finance Higher bid |
| 3 | 3₹1.9 Cr+₹13.8 L (7.75%)Rejected-Finance | ₹1.9 Cr+₹13.8 L (7.75%) | 3 | Rejected-Finance Higher bid |
| 4 | 4₹2.1 Cr+₹27.8 L (15.6%)Rejected-Finance 00 SUBHASH WARD DONGARGARH RAJNANDGAON RAJNANDGAON CHHATTISGARH 491445 UDYAM CG 15 0004239 | RAJNANDGAON | CHHATTISGARH | 491445 | ₹2.1 Cr+₹27.8 L (15.6%) | 4 | Rejected-Finance Higher bid |
| 5 | Rejected-Technical | - | - | Rejected-Technical substantially non responsive |
| Sl No | Description | Qty | Unit | SIDHIRAJ DEVELOPERS PVT. LTD. L2 | M/s Anmol Construction L4 | BHUSHAN ASSOCIATES L3 | MS DEO CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 618.91 | Cum | 133.45 ₹82,593.01 | 151.82 ₹93,962.31 | 200 ₹1,23,781.2 | 131.63 ₹81,466.6 Lowest |
| 2.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 389.17 | Cum | 13.63 ₹5,304.36 | 15.51 ₹6,036 | 200 ₹77,833.6 | 13.45 ₹5,234.31 Lowest |
| 3.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 326.05 | Cum | 48.59 ₹15,842.53 | 55.28 ₹18,023.77 | 200 ₹65,209 | 47.93 ₹15,627.34 Lowest |
| 4.00 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode measurement compacted Volume). | 247.83 | Cum | 113.29 ₹28,076.55 | 128.88 ₹31,940.2 | 200 ₹49,565.8 | 111.74 ₹27,692.41 Lowest |
| 5.00 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 98.54 | Cum | 518.18 ₹51,059.9 | 589.51 ₹58,088.55 | 800 ₹78,829.6 | 511.11 ₹50,363.25 Lowest |
| 6.00 | Providing designation 75B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 125.55 | Cum | 4,491.92 ₹5,63,938.1 Lowest | 5,110.26 ₹6,41,567.59 | 5,000 ₹6,27,725 | 4,700 ₹5,90,061.5 |
| 7.00 | Providing designation 75Bbrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 255.86 | Cum | 4,609.55 ₹11,79,394.85 Lowest | 5,244.08 ₹13,41,745.06 | 5,000 ₹12,79,295 | 4,750 ₹12,15,330.25 |
| 8.00 | Providing designation 125mm thick reinforced designation 75A brick work in (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening carriage of materials, scaffolding, raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement all complete as per building specification and direction of E/I. | 236.9 | Sqm | 627.16 ₹1,48,571.07 | 713.49 ₹1,69,022.21 | 600 ₹1,42,137 Lowest | 618.6 ₹1,46,543.25 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement :1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 3.41 | Cum | 4,361.36 ₹14,854.79 | 4,961.73 ₹16,899.65 | 5,500 ₹18,733 | 4,301.82 ₹14,652 Lowest |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20mm nominal size) | 2.97 | Cum | 4,041.84 ₹12,004.26 | 4,598.23 ₹13,656.74 | 5,200 ₹15,444 | 3,986.67 ₹11,840.41 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
2 May 2025, 3:00 pmClosed
EE BCD BUILDING DIVISION,HAZARIBAG
Office of the Executive Engineer, Building Construction Department, Building Division, Hazaribag
Proposed Construction of 50 Beded S.C. Boys Hostel in Govt. S.C High School cum Hostel Building, Barsot Block-Barhi, Dist-Hazaribagh For the year 2024-2025
2025_BCD_100414_1
BCD/EE/HAZARIBAG/01/01/2025-26
Open Tender
Civil Works
Item Rate
270 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹4.1 L
7 Nov 2025
19 Apr 2025
3 May 2025
19 Apr 2025
2 May 2025
19 Apr 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .