Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical AS PER NIT PHYSICAL EMD NOT SUBMITTED |
Tender Value
₹4.9 L
EMD Value
₹9,746
Closing Date
24 Oct 2024, 11:00 amClosed
AC (ELECT)
AC (Elect) BSF Academy Tekanpur, RE wing
Repair and maintenance of 750 KVA Transformer and shiftiting of 500 kva transformer installed in 33/0.440 kv Substation of Composite Hospital under BSF Academy Tekanpur.
2024_BSF_830712_1
12/CH/ENGG/ELECT/24-25
Open Tender
Electrical Works
Item Rate
45 days
IN AOR BSF ACADEMY TEKANPUR
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹9,746
30 Oct 2024
14 Oct 2024
25 Oct 2024
14 Oct 2024
24 Oct 2024
14 Oct 2024
Amount
Rewinding of 3 Phase i.e. Phase R Phase Y, phase B, High Tension Electrical winding (33 KV) of 750 KVA power transformer alongwith suitable size (same size of existing burnt winding) Copper conductor all necessary material and insulating materials (cost after deducting cost of the burnt winding) i/c lifting and transportation of 750 KVA, 33/0.44 KV rating Transformer to factory and back to the site i.e. 33/0.44 KV Substation and making electrical connection, installation, testing & commissioning etc. as required(scrap/dismantled material will be retained by the contractor)12 months warranty should be given against winding defects)
Rewinding of 3 Phase and neutral i.e. phase R, Phase Y, phase B, and neutral Low Tension Electrical winding (33/0.44 KV) of 750 KVA power transformer along with suitable size (same size of existing burnt winding) Copper conductor all necessary material and insulating materials (cost after deducting cost of the burnt winding) i/c lifting and transportation of 750 KVA, 33/0.44 KV rating Transformer to factory and back to the site i.e. 33/0.44 KV Substation and making electrical connection, installation, testing & commissioning etc. as required(scrap/dismantled material will be retained by the contractor)12 months warranty should be given against winding defects)
Ovening (Drying of active parts by ovening for 48 to 72 hours at 90 to 100 C temprature for removal of moisture of the repaired Transformer ) of 750 KVA, 33/0.44 KV rating Transformer i/c lifting and transportation of 750 KVA, 33/0.44 KV rating Transformer to factory and back to the site i.e. 33/0.44 KV Substation and making electrical connection, installation, testing & commissioning etc. as requiredcomplete in all respects.
Replacement of transformer oil .of 750 KVA, 33/0.44 KV rating Transformer as required complete in all respects.(old Transformer oil will be retained by the contractor).(oil testing report to be submitted as per direction by engineer in charge).
Replacement of transformer packing i.e.Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.of 750 KVA, 33/0.44 KV rating Transformer as requiredcomplete in all respects.
Supply & fitting oil temperature guage with sensor & providing control wiring for operation of buzzer in abnormal temp. condition of oil. as required complete in all respects.
Supply & fitting Miscellaneous insulating materials like Bakelite sheet, Porcelain washer and HV Bushing and metal parts suitable for 33 KV rating. etc. as required.complete in all respects.
Painting of 750 KVA, 33/0.44 KV rating Transformer in installed position with one or more coats of spray painting with synthetic enamel/polymer paint of approved brand and manufacture to give an even shade and removal of oil residue , including cleaning of surface l etc as required.
Disconnection, dismantling, lifting and shifting of 500 KVA & 750 KVA, 33/0.44 KV rating Transformer to at site with in substation area i.e. 33/0.44 KV Substation and making electrical connection, installation, testing & commissioning etc. as required.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .