Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.1 LAccepted-AOC MAHARASHTRA MAHARASHTRA | NASHIK | MAHARASHTRA | 422213 | ₹86.1 L | L1 | Accepted-AOC Tender Accept on Tender Cost |
Tender Value
₹86.1 L
EMD Value
₹86,062
Closing Date
27 Aug 2026, 5:00 pmClosed
Chief Executive Officer
Z P Satara
Work of designing providing Constructing Erecting, Installation and Commissioning of 3 / 5 / 15 KLD Capacity Faecal Sludge Treatment Plant based on Tiger Bio-filter Technology Pusesawali Tal Khatav Dist Satara
2026_SATAR_1329581_6
ZPS/RWS/FSM/2026 -27-1st call
Open Tender
Solid Waste Management
Percentage
365 days
Pusesawali
As Per B-1 Tender
4 documents required · 4 mandatory
₹5,250
₹86,062
17 Sept 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Designing, Constructing, Installing, Comissioning, Erecting of 5 KLD Fecal Sludge Treatment Plant Based on CAMUS at Pusesawali Tal- Khatav Dist - Satara
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259)
Excavation work (0.0-1.5 M) | 4.2 | Cum | 181.5 | ₹762.3 |
| 2 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259)
Excavation work (0.0-1.5 M) | 4.2 | Cum | 232.1 | ₹974.82 |
| 3 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 4/259)
Excavation work (0.0-1.5 M) | 5.6 | Cum | 691.9 | ₹3,874.64 |
| 4 | Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)
Soling | 7.2 | Cum | 1,447.6 | ₹10,422.72 |
| 5 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. M-150
PCC- M15 | 2.02 | Cum | 6,469.1 | ₹13,067.58 |
| 6 | Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) M-30
RCC- M30 Raft | 3.5 | Cum | 9,012.3 | ₹31,543.05 |
| 7 | Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F-17/306)
Steel | 0.42 | MT | 94,700.1 | ₹39,774.04 |
| 8 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259)
Excavation work (0.0-1.5 M) | 4.98 | Cum | 181.5 | ₹903.33 |
| 9 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259) | 4.98 | Cum | 232.1 | ₹1,155.16 |
| 10 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 4/259)
Excavation work (0.0-1.5 M) | 6.64 | Cum | 691.9 | ₹4,591.45 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.86 MB
Nit.pdf
Tender Documents • 1.38 MB
B1.pdf
Other Document • 2.75 MB
BOQ_2276292.xls
BOQ • 5.49 MB
Corri.pdf
PDF • 0.21 MB
Corri.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .