| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.4 LAdmitted-Finance | +7.86% | ₹36.4 L | L1 | Admitted-Finance |
| 2 | L2₹37.1 L+₹72,169.02 (1.98%)Admitted-Finance | +10.00% | ₹37.1 L+₹72,169.02 (1.98%) | L2 | Admitted-Finance |
Tender Value
₹33.7 L
EMD Value
₹67,440
Closing Date
7 Apr 2026, 6:00 pmClosed
EO Nagar Palika, Rawatbhata
EO Nagar Palika, Rawatbhata
Construction work of Basketball Court and Changing Room with Toilet in Rana Punja Stadium, Rawatbhata
2026_DLB_548620_1
NIT No. 12/2025-26 (No. 1550)
Open Tender
Civil Works
Percentage
90 days
Rawatbhata
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO Nagar Palika, Rawatbhata
₹67,440
Yes
25 May 2026
26 Mar 2026
8 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | |||||
| 2Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | |||||
| 3Random Rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRTH specification including all scaffolding material, labour, machinery but excluding pointing and plastering. In cement mortar 1:3 (1 cement : 3 coarse sand) | |||||
| 4Brick masonry work in cement mortar with mechanical mixer with First class bricks (min. 10.5 Mpa) in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 & 1300 of MoRTH specification including all scaffolding material, labour, machinery but excluding pointing and plastering In cement mortar 1:3 (1 cement : 3 coarse sand) | |||||
| 5Centering and shuttering with plywood or steel sheet upto two stories (each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | |||||
| 6Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars | |||||
| 7Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centering, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-25 Grade Concrete (1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) As per design mix | |||||
| 8Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | |||||
| 9Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine coarse sand) | |||||
| 10Providing and Fixing 1st quality standard white, grey, ivory, fume red brown, light green, light blue and other light shades glazed tiles confirming to IS : 13753 & IS :15622 of size 200mm × 300mm in walls, floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (excluding the cost of cement plaster on walls and pillar). | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_978068.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .