Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.9 Cr+₹4.0 L (1.04%)Rejected-AOC DHANI CHANDPUR BAWAL ROAD REWARI DHANI CHANDPUR BAWAL ROAD REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹3.9 Cr+₹4.0 L (1.04%) | L2 | Rejected-AOC Refunded |
| 3 | L3₹4.0 Cr+₹13.7 L (3.58%)Rejected-AOC MITTAL FARM LOHARU ROAD CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹4.0 Cr+₹13.7 L (3.58%) | L3 | Rejected-AOC Refunded |
| 4 | Not Admitted-Fee/PreQual/Technical HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹8.3 L
Closing Date
11 Aug 2023, 3:00 pmClosed
PARDEEP KUMAR
EE PHE Division Mohindergarh
AKBARPUR NANGAL PROVIDING CANAL BASED WATER SUPPLY SCHEME AKBARPUR NANGAL FOR GROUP OF 3 VILLAGES AKBARPUR NANGAL, BACHINI and GAGARWAS DISTRICT MAHENDERGARH.
2023_HRY_301299_1
202329E3856B 9A0A 4D39 9C5F 28BE125203D9597PUH
Open Tender
Civil Works
Works
520 days
AKBERPUR NANGAL
AKBARPUR NANGAL - PROVIDING CANAL BASED WATER SUPPLY SCHEME AKBARPUR NANGAL FOR GROUP OF 3 VILLAGE (AKBARPUR NANGAL BACHINI AND GAGARWAS) DISTT. MAHENDERGARH.Construction of 1 Raw water pumping station, 1 water works, laying the raw and clear wate
3 documents required · 3 mandatory
₹15,000
₹8.3 L
Yes
Mohindergarh
12 Oct 2023
4 Aug 2023
11 Aug 2023
4 Aug 2023
11 Aug 2023
4 Aug 2023
4 Aug 2023 - 7 Aug 2023
7 Aug 2023
Amount
Supplying, erection, testing and commissioning of Horizontal motor pumping set for raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. 2700 LPM 30.00 mtr head 30.00 BHP
Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked 1100 LPM 12.50 mtr head 7.50 BHP
Providing and fixing of LED Light 200 Watt , make of Standard Brand Complete in all respect
Operation and Maintenance for complete scope of work mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 months during defect liability period and 03 Months trial run will be charged to the A/Mtc. estimate complete in all respect as per approved NIT. Operation and Maintenance during defect liability period (Operation only) after 3 month trial run
Operation and Maintenance during 1st year after defect liability period.
Operation and Maintenance during 2nd year.
Operation and Maintenance during 3rd year.
Operation and Maintenance during 4th year.
Operation and Maintenance during 5th year.
Bidder Name
Amount
Rakesh Yadav Contractor(GSTN-NA)
RAM PHAL SINGH CONT(GSTN-NA)
ANAND KUMAR CONT(GSTN-NA)
RAM PHAL SINGH CONT
ANAND KUMAR CONT
ANAND KUMAR CONT
Rakesh Yadav Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .