Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | -39.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.6 L+₹21,416.97 (6.39%)Admitted-Fee/PreQual/Technical/Finance | -35.10% | ₹3.6 L+₹21,416.97 (6.39%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.8 L+₹40,916.91 (12.2%)Admitted-Fee/PreQual/Technical/Finance MR HANAN GULZAR R O MIRMAIDAN DOORU | ANANTNAG | JAMMU AND KASHMIR | 192101 | -31.55% | ₹3.8 L+₹40,916.91 (12.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.8 L+₹49,430.97 (14.8%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.8 L+₹49,430.97 (14.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹4.0 L+₹62,614.03 (18.7%)Admitted-Fee/PreQual/Technical/Finance | -27.60% | ₹4.0 L+₹62,614.03 (18.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.5 L
EMD Value
₹16,470
Closing Date
21 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF RWALL EARTHWORK FROM CROSSING TO ONWARDS GUJJAR BASTI PANZOO VERINAG
2026_RDPR_320926_95
ENIT92of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹16,470
29 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means in trenches hydraulic excavator over areas exceeding 30cm in depth and 1.5mts in width 10sqm on plan all kinds of soils | 201.42 | Cum | - | - |
| 0.0 | P/L of stone soling of tightly hand packed including all carriages | 4.5 | Cum | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm NSA | 60.42 | Cum | - | - |
| 0.0 | Plumbs including all carriages | 17.26 | Cum | - | - |
| 0.0 | Form work for centering and shuttering including propping etc & removal of same | 141.64 | sqm | - | - |
| 0.0 | 12 mm thick C Plaster in 1: 6 Mix | 177.04 | sqm | 1 | ₹176.86 |
| 0.0 | Carriage charges of materials Sand/Agg. by m.t 20 Km and H/L 200m | 82.18 | cum | 1 | ₹82.1 |
| 0.0 | Providing and fixing of CIB including photographs | - | job | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1069120.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .