Tender Value
Refer Docs
EMD Value
₹27,500
Closing Date
1 Feb 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/Madurai
SE/GCC/MADURAI
EWE SS concreting transporting RS Madai 110 KV SS loc.1-5
2021_EB_192383_1
SE-GCC-MDU SPEC.NO.100/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹27,500
Yes
20 Mar 2021
25 Jan 2021
2 Feb 2021
25 Jan 2021
1 Feb 2021
25 Jan 2021
120 days
Amount
Clearing Juliflora jungle without uprooting including all cost of labour lead lift etc complete.
Uprooting and removing large palmyrah / Coconut stumps
Check survey, pit marking of tower as per direction of site Engineer including cost of all Tools and Plants, labour, lead, lift etc complete.
Levelling the site for forming approach road by using earth mooving equipment including lead, lift etc., complete.
Supplying, collection and stacking, spreading of gravel for approach road including cost and conveyance of gravel and all labour charges lead, lift etc., complete.
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation.
Forming coffer dam for divertion of water with sand bags during the construction of pile foundation including cost of all materials labour, lead, lift etc., complete.
Dewatering using 3/5 HP diesel engine during excavation and concreting including fuel and other chares, lead and lift etc., complete.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete.
PCC 1:3:6 using 40mm metal (machine crushed) for concrete including cost of all materials, without form work, lead, lift, labour etc complete.
RCC M20 using 12 to 20 mm HBG metal for well ring with steel shuttering and steel form work including cost and conveyance of all materials, labour, lead, lift etc., complete but excluding cost of steel reinforcement.
Supply, cutting and bending the steel rods of required size and length as per the instruction of Engineer incharge, including tying and placing to the correct alignment and level as per drawing including cost and conveyance of all materials, lead, lift etc., complete.
Labour charges for Transporting of template and stubs to site and assembling the template at site and shifting the template from loc to loc KCR wet
PCC 1:2:4 using 20mm metal (machine crushed) for foundation footings including cost of all materials lead lift labour with formwork etc complete.
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earth strip with the leg of the stub including cost of all materials lead, lift etc.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KCR wet
Transporting and Sorting out of tower parts in stores, loading into lorry, transporting the same to site, unloading at site, erection of towers, tightening punching of bolts and nuts including all lead, lift, labour etc complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanized paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .