| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Finance | ₹14.6 L | L1 | Admitted-Finance |
| 2 | L2₹16.0 LAdmitted-Finance | ₹16.0 L | L2 | Admitted-Finance |
| 3 | L3₹17.2 LAdmitted-Finance | ₹17.2 L | L3 | Admitted-Finance |
| 4 | L4₹17.4 LAdmitted-Finance | ₹17.4 L | L4 | Admitted-Finance |
| 5 | L5₹17.6 LAdmitted-Finance | ₹17.6 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HSV ENTERPRISES L6 | BMRCE Infrastructure L4 | DAKSHNA MOORTHY D H L3 | Subramani M. L2 | MAHALAXMI CONSTRUTIONS L7 | MANJUNATHA ENTERPRISES L5 | Effects Engineers and Contractors L8 | C DORASWAMY RAJU L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. | 2,500 | Sq,m | 105 ₹2.6 L | 97 ₹2.4 L | 50 ₹1.3 L | 80 ₹2 L | 88 ₹2.2 L | 87 ₹2.2 L | 25 ₹62,500 | 40 ₹1 L |
| 1.02 | Wall painting with premium acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. One coat as per specifications and as per
directions of Engineer in charge | 9,600 | Sq,m | 70 ₹6.7 L | 54 ₹5.2 L | 80 ₹7.7 L | 60 ₹5.8 L | 81 ₹7.8 L | 58 ₹5.6 L | 100 ₹9.6 L | 60 ₹5.8 L |
| 1.03 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge | 5,000 | Sq,m | 140 ₹7 L | 90.75 ₹4.5 L | 85 ₹4.3 L | 70 ₹3.5 L | 81 ₹4.0 L | 96 ₹4.8 L | 110 ₹5.5 L | 70 ₹3.5 L |
| 1.04 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specifications and as per directions of Engineer in charge. | 2,500 | Sq,m | 30 ₹75,000 | 78 ₹1.9 L | 75 ₹1.9 L | 68 ₹1.7 L | 100 ₹2.5 L | 66 ₹1.6 L | 110 ₹2.8 L | 75 ₹1.9 L |
| 1.05 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on network over an under coat of suitable shade with ordinary paint of approve brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | 2,000 | Sq,m | 60 ₹1.2 L | 148 ₹3.0 L | 80 ₹1.6 L | 130 ₹2.6 L | 120 ₹2.4 L | 146 ₹2.9 L | 130 ₹2.6 L | 95 ₹1.9 L |
| 1.06 | Finishing walls with textured exterior paint of required shade :Old work (Two coats on existing cement paint surface applied @ 3.28 l/10 m² including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | 150 | Sq,m | 80 ₹12,000 | 140 ₹21,000 | 200 ₹30,000 | 155 ₹23,250 | 200 ₹30,000 | 189 ₹28,350 | 120 ₹18,000 | 200 ₹30,000 |
| 1.07 | Finishing walls with textured exterior paint of required shade :Old work(One coats) applied @ 1.82 l/10 m² including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | 150 | Sq,m | 130 ₹19,500 | 95 ₹14,250 | 150 ₹22,500 | 120 ₹18,000 | 100 ₹15,000 | 113 ₹16,950 | 110 ₹16,500 | 150 ₹22,500 |
Tender Value
₹20.3 L
EMD Value
₹62,000
Closing Date
11 May 2026, 3:00 pmClosed
Chief Manager (Infrastructure)
Chief Manager (Infrastructure), Estate Section, IIMB Bannerghatta Road Campus
Painting Works at MDC Block at New IIMB Campus
2026_IIMB_905698_1
CMI/SMCD/201/2025-26
Open Tender
Civil Works
60 days
IIMB Anekal Campus
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹62,000
Estate Section, IIMB Bannerghatta Road Campus
4 Jun 2026
17 Apr 2026
12 May 2026
17 Apr 2026
11 May 2026
28 Apr 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. | - | Sq,m | - | - |
| 1.02 | Wall painting with premium acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. One coat as per specifications and as per
directions of Engineer in charge | - | Sq,m | - | - |
| 1.03 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge | - | Sq,m | - | - |
| 1.04 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specifications and as per directions of Engineer in charge. | - | Sq,m | - | - |
| 1.05 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on network over an under coat of suitable shade with ordinary paint of approve brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | - | Sq,m | - | - |
| 1.06 | Finishing walls with textured exterior paint of required shade :Old work (Two coats on existing cement paint surface applied @ 3.28 l/10 m² including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | - | Sq,m | - | - |
| 1.07 | Finishing walls with textured exterior paint of required shade :Old work(One coats) applied @ 1.82 l/10 m² including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | - | Sq,m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_951990.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid