Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC Work Closure/AOC |
Tender Value
₹4.4 L
EMD Value
₹8,722
Closing Date
29 Mar 2023, 10:00 amClosed
Block Development Officer, Karaikal
Block Development Office, Karaikal
Construction of Community soak pit for Agastheeswarar Theertha kulam belongs to Thirunallar devasthanam at Thirunallar South VP of Karaikal Block.
2023_DRDA_12273_1
BDO/KKL/2022-23/K4
Open Tender
Civil Works
Item Rate
30 days
Thirunallar Commune
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹8,722
21 Feb 2025
17 Mar 2023
29 Mar 2023
17 Mar 2023
29 Mar 2023
17 Mar 2023
Amount
Earthwork in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50m and lift upto 1.5m - disposal earth to be levelled and neatly dresses - all kinds of soil.
Supplying and filling in plinth with river sand under floors, including watering, ramming consolidation and dressing complete.
Supplying and filing with gravel (excluding rock) in trenches, plinth sides of foundations etc. In layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering etc., complete including all lead and lift.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form work for - retaining walls, return walls, walls (ant thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and stepd etc.
Providing and fixing upto floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shleves, louvers, steps, stair cases, etc. including hoisting and setting in position with cement mortar 1 : 3 ( 1 cement : 3 coarse sand), cost of required centering, shuttering complete - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level - Thermo - Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
12mm cement plaster of mix - 1:4 (1 cement : 4 fine sand)
Wall painting with acrylic emulsion paint of approved brand and manufacturer to give an even shade - Two or more coats on new work
Providing and fixing on wall / column face unplasticised - PVC soil and waste pipes (type - B) conforming to IS : 13592 - 1992 including jointing with seal ring conformation to IS : 5382 leaving 10mm gap for thermal expansion - single socked pipes - 110 mm diametre
Providing and laying filter media for coarse sand under concrete block loose apron ( as filter media) to required thickness including removal of foreign matters, ramming, consolidation with watering
Providing and laying filter media using HBG metal of 20 mm size to a arequired thickness
Providing and laying filter media using HBG metal of 40mm size to a required thickness
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .