Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹28,000
Closing Date
31 Aug 2026, 5:00 pm3d left
EE UDAC Mathura
EE UDAC Mathura
LOT32
2026_UPIDC_1179612_32
06/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹28,000
Yes
25 Aug 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
31 Aug 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work. | 364.36 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge. | 36.56 | CUM | - | - |
| 3 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 1.53 | CUM | - | - |
| 4 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 100.45 | CUM | - | - |
| 5 | Struck Pointing in 1:2 Cement mortor in Brick Masonry including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 112.8 | SQM | - | - |
| 6 | Providing centering & shuttering for bridge slab, bed block, dirt wall, in Raft foundation and transitions for Reinforcement cement concrete work i/c all cost of labour & T&P etc complete for proper completion of work | 50.76 | SQM | - | - |
| 7 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 10.2 | CUM | - | - |
| 8 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 4.74 | SQM | - | - |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. | 37.34 | SQM | - | - |
| 10 | Making cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | 0.92 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.85 MB
BOQ_2218420.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].