Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical PTAEL NAGAR TELIPHONE EXCHANGE BIJROL ROAD BARAUT BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹24.4 L
EMD Value
₹24,500
Closing Date
22 Nov 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
THE WORK OF SHIFTING AND HEIGHT RAISING OF TOWERS OF 132 KV CHANDAUSI-BEHJOI DC LINE BETWEEN TOWER NO. 10 TO 11 DUE TO GANGA EX-PRESS WAY UNDER ELECTRICITY TRANSMISSION DIVISION SAMBHAL
2021_UPTCL_622567_2
E-T-37/ ETCM/2021-22
Open Tender
Electrical Works
Fixed-rate
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE ETC I MORADABAD
₹24,500
8 Dec 2021
11 Nov 2021
22 Nov 2021
11 Nov 2021
22 Nov 2021
11 Nov 2021
90 days
Amount
TOWER ACCESSORIES
Number Plate
Danger Plate
Phase Plate
Pipe type earthing material for towers
120 KN Polymer String for 132KV Tension Towers
HARDWARE SUITABLE FOR ACSR PANTHER
Single Tension Fitting
Double Tension Fitting
Repair Sleev
Mid Span Compressor joint
Vibration Damper
EARTHWIRE ACCESSORIES SUITABLE FOR 7/10 SWG EARTHWIRE
Tension Clamp
Vibration Damper
Copper bond
Check survey & final peg marking.
Cost of excavation of 132KV tower foundation pits including all earth work, back filling watering and leveling.
Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for following 132KV D/C towers:-
Cost of Concreting for all types of 132KV D/C tower foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 mix concrete (RCC).
Erection of super structure of 132KV DC towers Including all works above ground level and fitting of danger , number & phase plate, Bird guard etc but excluding hoisting of insulator, hardware & accessories.
Tack wedling of all the bolts up to the height of one section or 5 Mtr. from ground level whichever is higher with three tacks of 10mm/12mm elctrode & applciation of Zinc rich point on the affected surface including cost of materials.
Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits.
Lowering down of ACSR Panther conductor including de-hoisting of all the necessary hardwares & accessories between 9 to 11 Tower of all the six phase conductors for shifting work.
Providing and fixing of back stay for safty purpose at Loc No 9 & 12 on temproray basis.
Making of cut point at newly erected 10 &11 B+0 type towers & resagging of ACSR Panther conductor including hoisting of all the necessary hardwares & accessories between Section to Section Tower of all the six phase conductors.
Laying ,stinging ,tensioning , clamping ,jointing etc of ACSR Panther conductor including hoisting of insulator and fitting all the necessary hardwares & accessories ie fitting Armour rod vibration dumper etc on all six phases conductor between Tower No 10 to 10A to 11A to 11
De-Stringing of 7/10 SWG Earthwire between 9 to 12 tower No.
Making of cut point at newly erected B+0 10 & 11 type towers & resagging of 7/10 swg Earthwire including hoisting of all the necessary hardwares & accessories between Section to Section Tower for E/W.
Laying ,stinging ,tensioning , clamping ,jointing etc of 7/10 swg Earthwire between NEW erected 4 Nos tower with the help of all the necessary hardwares & accessories between Tower No 10 to 10A to 11A to 11
Dismentling of Tower No 10A+0,11A+0
Destroying of 2 Nos towers RCC Chimeny below 1 mtr from ground level inclouding cutting of stub, back filling and dispose of use less concreting.
Grounding work including all earth work etc. for pipe type earthing including cost of all materials except earthing pipe.
Carriage of all required material from store to site by private vechicle work also including loading and unloading the same
Carriage of all Dismentalled material as tower parts, conductor etc site to JE store by private vechicle work also including loading and unloading the same
A.RAMAN POWER ENGINEERS
Shiam and sons
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .