Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance 4 13A PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹8.7 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹9.2 LAccepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹9.2 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | TEAM ENGINEERING AND CONSTRUCTION | ANNAI ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instruction of Engineer in charge and disposing the debris 1 Km. away from the site including cost of labours, lead, lift, etc. complete. | 4.88 | M3 | 26,352 ₹31,095.36 | 25,083.2 ₹29,598.18 |
| 2.00 | Labour charges for cutting, welding, fabrication & laying in position of the MS boiler tubes / MS Plates including cost of labour charges, cutting, fabrication charges, lead, lift, etc., complete. (M.S Scrap will be supplied by Dept. at free of cost). | 816.4 | Kg | 36,738 ₹43,350.84 | 34,288.8 ₹40,460.78 |
| 3.00 | Providing shuttering using steel structures including cost of all materials, labours, lead, lift, etc. complete. | 70.56 | M2 | 42,336 ₹49,956.48 | 40,430.88 ₹47,708.44 |
| 4.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 1,330.4 | Kg | 1,38,361.6 ₹1.6 L | 1,30,379.2 ₹1.5 L |
| 5.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 16.64 | M3 | 1,83,040 ₹2.2 L | 1,73,904.64 ₹2.1 L |
| 6.00 | Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 572 | M2 | 2,54,540 ₹3.0 L | 2,42,528 ₹2.9 L |
| 7.00 | Supplying and Providing Nito floor hard top over the existing PCC concrete surface of 5Kg/sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc complete. | 572 | M2 | 2,17,360 ₹2.6 L | 2,05,920 ₹2.4 L |
| 8.00 | Providing two coats of anticorrosive black paint to the new surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete. | 70.56 | M2 | 15,382.08 ₹18,150.85 | 14,535.36 ₹17,151.72 |
| 9.00 | Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. Complete. | 8.32 | M2 | 1,347.84 ₹1,590.45 | 1,281.28 ₹1,511.91 |
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
26 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Rectification Works to the Damaged Pedestals and Providing Encasing Concrete to the Structural Steel Columns in ID Fan 5A and 5B area
2026_EB_661513_1
CE SE C TTPS Spec.No. 407 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,400
Yes
2 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Dismantling the existing damaged RCC for the required width & depth as per the instruction of Engineer in charge and disposing the debris 1 Km. away from the site including cost of labours, lead, lift, etc. complete.
Labour charges for cutting, welding, fabrication & laying in position of the MS boiler tubes / MS Plates including cost of labour charges, cutting, fabrication charges, lead, lift, etc., complete. (M.S Scrap will be supplied by Dept. at free of cost).
Providing shuttering using steel structures including cost of all materials, labours, lead, lift, etc. complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and Providing Nito floor hard top over the existing PCC concrete surface of 5Kg/sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc complete.
Providing two coats of anticorrosive black paint to the new surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. Complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_794012.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid