| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,010Accepted-AOC | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹94,500+₹3,500 (3.85%)Rejected-AOC | L2 | Rejected-AOC Tender Not Accepted |
| Sl No | Description | Qty | Unit | DURAI ENGINEERING WORKS L2 | RAYAN AND COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for providing scaffolding disconnect the power and control cables and transformer secondary field connections, dismantling the transformer top cover, lifting the rectifier transformer core, flushing the core and winding assembly, rectifier diode stack and transformer tank with new transformer oil inspect the bushing and internal connections. After completion of work reassembling the transformer core, placing the top cover and then reconnecting the transformer power and control cables. After completion of this work the scaffolding pipes to be dismantled (ESP transformer) | 1 | No | 32,000 ₹37,760 | 31,000 ₹36,580 Lowest |
| 2.00 | Charges for delinking the isolator assembly of rectifier transformer set from the negative terminal insulator housing and removing the rectifier transformer from its bed. | 1 | No | 20,000 ₹23,600 | 19,000 ₹22,420 Lowest |
| 3.00 | Charges for releasing the failed HVRT from ESP roof top and shifting to ground floor. | 1 | No | 20,000 ₹23,600 | 19,000 ₹22,420 Lowest |
| 4.00 | Charges for lifting the spare HVRT from ground floor to ESP roof top and erecting in place of failed HVR transformer. | 1 | No | 22,500 ₹26,550 | 22,000 ₹25,960 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
17 Sept 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM II Replacement of defective High Voltage Rectifier Transformer D5 by spare healthy HVR Transformer in ESP I at Unit I
2025_EB_599751_1
CE/SE/ES/TTPS/No.156/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,000
Yes
8 Nov 2025
2 Sept 2025
18 Sept 2025
2 Sept 2025
17 Sept 2025
2 Sept 2025
Charges for providing scaffolding disconnect the power and control cables and transformer secondary field connections, dismantling the transformer top cover, lifting the rectifier transformer core, flushing the core and winding assembly, rectifier diode stack and transformer tank with new transformer oil inspect the bushing and internal connections. After completion of work reassembling the transformer core, placing the top cover and then reconnecting the transformer power and control cables. After completion of this work the scaffolding pipes to be dismantled (ESP transformer)
Charges for delinking the isolator assembly of rectifier transformer set from the negative terminal insulator housing and removing the rectifier transformer from its bed.
Charges for releasing the failed HVRT from ESP roof top and shifting to ground floor.
Charges for lifting the spare HVRT from ground floor to ESP roof top and erecting in place of failed HVR transformer.
DURAI ENGINEERING WORKS (BID ID -1451176)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .