Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.8 LAWARDED | AWARDED |
Tender Value
₹6.5 L
EMD Value
₹16,210
Closing Date
11 Jul 2025, 10:00 pmClosed
Directorate of Municipal Administration
Construction of Kitchen and Installation of main Gate to Dr Babu JagaJivanram Bhavan in RNR CMC Limit
DMA/2025-26/OW/WORK_INDENT43292
DMA/2025-26/OW/WORK_INDENT43292
Open
Other Works
Two Tender Document System(Two Cover)
DMA City Municipal Council Ranibennur
₹500
₹16,210
27 Jun 2025
27 Jun 2025
14 Jul 2025
11 Jul 2025
Construction of Kitchen and Installation of main Gate to Dr Babu JagaJivanram Bhavan in RNR CMC Limit
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed raded coarse aggregates and fine aggregates as per relevant IS ...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Foundation upto Plinth. All other types 3% PWD Co...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Plinth beams of Buildings 50% PWD S.R. 2023-...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Plinth beams of Buildings 50% PWD S.R. 2023-...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate RCC Beams, Lintels & Troughs of Aqueducts 60% PW...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate RCC Roof Slabs 50% PWD S.R. 2023-24 Volume 1 (P...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .