Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 1 56G AST PETROL BUNK ERODE BHAVANI PIRIVU ROAD RS SANKARI SALEM 637 302 | SANKARI | SALEM | TAMIL NADU | 637302 | ₹2.3 Cr Quoted ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 CrRejected-AOC | ₹2.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹2.6 CrRejected-AOC 5 A1 4 PANNAIKARAN STREET RAKKIYAMPATTY KONGNAPURAM PO EDAPPADY TK SALEM DT 639 002 | KARUR | TAMIL NADU | 639002 | ₹2.6 Cr | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | VALAR & CO L2 | R Muthusamy and Company L1 | RS INFRA L3 |
|---|---|---|---|---|---|---|
| 1.00ROAD WORK | ||||||
| 1.01 | Clearing Heavy Jungle Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.r etc., complete complying with standard specification and as directed by SIPCOT Officers. | 2,861 | Sqm | 9.8 ₹28,037.80 | 9.44 ₹27,007.84 | 11 ₹31,471 |
| 1.02 | Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side etc., complete complying with standard specification and as directed by SIPCOT Officers. | 1,125 | Cum | 141.75 ₹1.6 L | 135.59 ₹1.5 L | 145 ₹1.6 L |
| 1.03 | Supply and laying NP2 class - 300m dia pipes including collar etc., complete complying with standard specification and as directed by SIPCOT Officers. | 30 | Rm | 1,197 ₹35,910 | 1,145.68 ₹34,370.40 | 1,200 ₹36,000 |
| 1.04 | Forming embankment using excavated earth (1 Km internal lead) which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc., complete as per the Clause 502 of MORTH Rev-5 etc., complete complying with standard specification and as directed by SIPCOT Officers. (Forming Embankment at 95% Compaction) | 1,311 | Cum | 45.6 ₹59,781.60 | 43.63 ₹57,198.93 | 50 ₹65,550 |
| 1.05 | Forming Subgrade using carted earth with a conveyance of 20Km having CBR value not less then 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc., complete as per the Clause 502 of MORTH Rev-5 etc., complete complying with standard specification and as directed by SIPCOT Officers. (Forming Subgrade at 97% Compaction) | 1,692 | Cum | 646.86 ₹10.9 L | 618.74 ₹10.5 L | 650 ₹11.0 L |
| 1.06 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5etc., complete complying with standard specification and as directed by SIPCOT Officers. | 356 | Cum | 2,156 ₹7.7 L | 2,062.4 ₹7.3 L | 2,200 ₹7.8 L |
| 1.07 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 etc., complete as per clause 503 of MORT& H specification. | 339 | Cum | 2,259 ₹7.7 L | 2,161.05 ₹7.3 L | 2,300 ₹7.8 L |
| 1.08 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 etc., complete as per specification using CMP as per clause 507 OF MORTH REV. specification and as directed by SIPCOT Officer. | 593 | Cum | 2,490 ₹14.8 L | 2,382.16 ₹14.1 L | 2,500 ₹14.8 L |
| 1.09 | Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specificationsetc., complete complying with standard specification and as directed by SIPCOT Officers. | 2,369 | Sqm | 92.6 ₹2.2 L | 88.64 ₹2.1 L | 100 ₹2.4 L |
Tender Value
₹2.3 Cr
EMD Value
₹1.3 L
Closing Date
27 Jan 2025, 3:30 pmClosed
SUPERINTENDING ENGINEER
SIPCOT Head office Egmore
Formation of Internal Road (20 m wide) to SIPCOT Industrial Park, Kurubarapalli, Krishnagiri District
2025_SIPCT_517296_1
NIT.No.33/CD/T.No.33/2024-25
Open Tender
Civil Works
SIPCOT Industrial Park, Kurubarapalli
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.3 L
SIPCOT HEAD OFFICE
12 Mar 2026
8 Jan 2025
28 Jan 2025
8 Jan 2025
27 Jan 2025
8 Jan 2025
20 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid