Loading…
Loading…
Tender ID
Tender Value
₹4.2 L
EMD Value
₹4,300
Closing Date
9 Feb 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
IMPROVEMENT WORKS FOR FOOD DISTRIBUTION SCHEME AT DIVISION OFFICE IN DIV-96,UNIT-21,ZONE-VIII
2026_CoC_651149_1
Z.O.VIII.C.NO.E1/355/2025
Limited
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,300
4 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
Providing granolithic floor finish of the followin...ected by the departmental officers) For 40mm thick
Construction of INSPECTION CHAMBER following ...per standard specification. CLEAR SIZE 0.60 X 0.60
Automatic Electrical Water Heater with copper cont... 35 Litres capacity 230V / 1000W (Lower End)
Painting Old Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.)
Roofing with Galvanised corrugated iron sheet of thickness 0.8mm
Supply, erection, testing and commissioning of fol... directed by the Departmental Officers. - 40mm dia
Wiring with 2 x 4 sq.mm. PVC insulated SC unsheat...mm copper wire for open PVC power plug point
Dadooing walls with following best approved qualit...design colour glazed tiles of size 300 x 200 x 6mm
Paving the floor with pre-polished concrete anti-...pproved by Executive Engineer before use on works)
Supplying and fixing in position 15mm dia b...utive Engineer before use on the works) Pillar Tap
Plastering with cement mortar 1:4 (1 cement and 4 ... sand)12mm thick including curing etc. complete.
White washing one coat over a new plastered surface..
Painting the new plastered walls with two coats of...tion and the durability period should be 5 years..
Painting the new plastered walls with two coats of...tion and the durability period should be 5 years..
Painting the new plastered walls with two coats of...tion and the durability period should be 5 years..
Painting the new plastered walls with two coats of...tion and the durability period should be 5 years..
Painting the new plastered walls with two coats of...tion and the durability period should be 5 years..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_780809.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .