Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-Finance | ₹3.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹4.0 Cr+₹14.4 L (3.77%)Rejected-Finance 112 21 A 2 K N MUKHERJEE ROAD P O TALPUKUR BARRACKPORE 24 PGS N | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹4.0 Cr+₹14.4 L (3.77%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.1 Cr+₹25.7 L (6.74%)Rejected-Finance | ₹4.1 Cr+₹25.7 L (6.74%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
4 Jul 2022, 3:00 pmClosed
Director General (WS)
5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and Maintenance of 60 MGD capacity Water Treatment Plant - II on round the clock basis at Garden Reach Water Works (GRWW) Complex for three years.
2022_KMC_379086_1
KMC/WS/GRWW(WTP-II)/01/2022-23
Open Tender
Miscellaneous Works
Item Rate
1095 days
GRWW
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7.3 L
15 Oct 2022
2 May 2022
7 Jul 2022
2 May 2022
4 Jul 2022
2 May 2022
Amount
Operation & Maintenance of 1x 60 MGD capacity conventational type Water Treatment Plant, Phase-II (WTP-II) at Garden Reach Water Works (GRWW), KMC {Rates to be quoted, all inclusive, considering expenses for all operation and maintenance activities, sweeping, required all office-stationaries, laboratory reagents etc for successful operation & maintenance of the plant for the production of required quantity of suitable potable water and other related works, as per site-requirements & directions of the EIC from time to time (but excluding the cost of supply of coagulants, disinfectants etc.), as per scope of works mentioned in the tender documents IN ORDER TO MAINTAIN PRODUCTION OF UNINTERUPTED POTABLE WATER (For the period of first 12 calender months).
Labour component: This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of the Mpl. Secretary as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect.
Other than labour component: This monthly cost remains unaltered from the date of commencement of work till end of first twelve calender months. This also indicates the base-cost upon which monthly cost of subsequent year will be determined.
Operation & Maintenance of 1x 60 MGD capacity conventational type Water Treatment Plant, Phase-II (WTP-II) at Garden Reach Water Works (GRWW), KMC {the rates are all inclusive, considering expenses for all operation and maintenance activities, sweeping, required all office-stationaries, laboratory reagents etc for successful operation & maintenance of the plant for the production of required quantity of suitable potable water and other related works, as per site-requirements & directions of the EIC from time to time (but excluding the cost of supply of coagulants, disinfectants etc.), as per scope of works mentioned in the tender documents IN ORDER TO MAINTAIN PRODUCTION OF UNINTERUPTED POTABLE WATER (For the period of subsequent 12 calender months).
Labour component: This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of the Mpl. Secretary as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequent increment will be in effect.
Other than labour component: This monthly cost remains unaltered from the date of commencement of 2nd twelve calender months till the end of the 2nd twelve calender months. This also indicates the base-cost upon which monthly cost of subsequent year will be determined.
Operation & Maintenance of 1x 60 MGD capacity conventational type Water Treatment Plant, Phase-II (WTP-II) at Garden Reach Water Works (GRWW), KMC {Rates to be quoted, all inclusive, considering expenses for all operation and maintenance activities, sweeping, required all office-stationaries, laboratory reagents etc for successful operation & maintenance of the plant for the production of required quantity of suitable potable water and other related works, as per site-requirements & direction of the EIC from time to time (but excluding the cost of supply of coagulants, disinfectants etc.), as per scope of works mentioned in the tender documents IN ORDER TO MAINTAIN PRODUCTION OF UNINTERUPTED POTABLE WATER (For the period of subsequent 12 calender months).
Labour component: This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of the Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component: This monthly cost remains unaltered from the date of commencement of 3rd twelve calender months till the end of the 3rd twelve calender months. This also indicates the base-cost upon which monthly cost of subsequent year will be determined.
M/s, TRIGONE AND COMPANY
MIK ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .