Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2 L
Closing Date
25 Jun 2026, 9:30 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Hubli Electricity Supply Company Limited
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally).
307411
HESCOM/2026-27/EL/WORK_INDENT1213/CALL-2
Open
Electrical
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have executed work of installation and commissioning of minimum of One No. 5MVA and above higher capacity power transformers of 33/11KV and above voltage class with associated switchgears and ODS on Total Turnkey or Partial turnkey or labour Contract basis in the last Five Financial Years in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis /self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note: Please note that the date of issuance of the work completion or performance certificates must be at least one year after the actual date of work completion.
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 32.29Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving work of installation and commissioning of 5MVA and above higher capacity power transformers 33/11KV and above voltage class of value not less than Rs. 53.82 Lakhs (50% of the amount put to Tender) in any State/Central Govt./ Distribution Companies/PSUs in the last Five Financial Years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)..As a proof of documentary evidence Award copies and work completion/Performance certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV. Note: Please note that, Award cost and Executed cost must be mentioned in the work completion/Performance certificates.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹2,700
₹2 L
18 Jun 2026
18 Jun 2026
29 Jun 2026
22 Jun 2026
22 Jun 2026
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '9 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "9 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2026-27/EL/WORK_INDENT1213/CALL-2 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Rs.in Lakhs
Note:Works completed during the period from (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25). shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 7974811.14 7974811.14
2 Labour charges+ Decommissioning (Exclusive of GST) 219635.77 219635.77
3 Civil Engineering Charges (Exclusive of GST) 775707.83 775707.83 2.806226956
5 Area Specific Loading @ 5% on labour charges 0 0 0.00 0.00
Contractors Profit @ 10% on Sl No. Sl No. 4 & 5 797481.11 21963.58 77570.78 897015.47
% age of tender compenents included
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
PART-A (Material portion)
Sl. No. Particulars Unit Qty Rate Amout in Rs. Reamarks
A.1 Power Transformers:
a) 33/11KV, 5 MVA, DELTA/STAR, DY 11, 3Ph, 50Hz,Core type winding with OLTC, RTCC panel etc., complete filled with Transil Oil and 10 % spare Oil in Non Returnable Drums (Power Transformer shall be supplied by departmentaly) (As per ESCOM's CSR- 2025-26 33KV Material. page No- 69 of 81 SL.No-1, Item No-1.01 ,Material Code-1.01)( Supplied Departmentally) Nos 0 6597322.00 0.00
Deloaded 21% on Estimate cost
A.2 33KV SF-6/ VCB Breakers:
a) 66 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi-pneumatic/pneumatic type operating mechanism and mounting structure etc., as per technical specification. (As per KPTCL SR 2025-26, Page No- 14, SL.No-278 Nos 1 645000 645000.00
A.3 Control and relay panels Simplex type as per technical specifications (Control Voltage 110V DC) 0.00
a) 33KV Panel for Overhead Line (KPTCL SR-2023-24, Page No:41,Sl. No-16 Item No:16.2.8,HSN Code,8537 Rs:214170 (33KV Panel rate) panel 0 178475.00 0.00 Not updated in new SR
b) 5MVA, 33/11KV Transformer Panel (KPTCL SR-2023-24, Page No:41, Sl. No-16 Item No:16.2.7,HSN Code,8537 Rs:631620 (66KV Panel rate rate is considered due to non availability for 33 KV Panel in the CSR 2023-24) panel 1 526350.00 526350.00 Not updated in new SR
A.4 33KV Current Transformers 0.00
a) 36KV, 20KA CT of ratio 400-200/1-1-1A with rigid terminal connector suitable for Coyote ACSR conductor with marshallling Box for Incomer. (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-6, Item No-2.01) Nos 0 57030 0.00
b) 36KV, 20KA CT of ratio 200-100/1-1-1A with rigid terminal connector suitable for Coyote ACSR conductor with marshallling Box for power transformer. (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-6, Item No-2.02) Nos 3 57030 171090.00
c) 11kV NCTs 600-300/1-1-1A (for PCVCBs upto 10 MVA Transformer) (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-14, Item No-2.10) No's 1 66582 66582.00
A.5 33KV Voltage Transformers 0.00
a) Voltage Transformers 33 kV/√3 / 110 V/√3 - 110 V/√3 (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-16, Item No-2.12) No's 0 53234 0.00
A.6 Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00
a) 30KV, 10KA normal duty Polymeric with terminal connectors suitable for Coyote Conductor (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-18, Item No-3.01) No's 3 11583 34749.00 Not updated in new SR
b) 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR) ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 13 SL.No-184 Item No-19.02) Set (3 Nos) 3 1735 5205.00 Not updated in new SR
A.7 33 KV Isolators : 0.00
1) 33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators 0.00
a) a) 33 kV, 800 A, 25 kA Upright without Earth Switch (As per KPTCL SR- 2023-24 Page No.34 SL.No-9, Item No-9.14.1 HSN Code-8535, RS-84700/-) Nos 1 70583 70583.33 Not updated in new SR
2) 11 KV Isolators 400A with manually operated isolators with Pad connectors suitable for Lynx ACSR Conductor, as per technical specification with cylindrical post insulators 0.00
a) 11KV 400A Special Roaster switch with H frame for mounting Structure. ( As per ESCOM's CSR- 2025-26. page No- 17 SL.No-220 Item No-24.09) Set 0 13295 0.00 Not updated in new SR
b) 11KV 400A Double break GOS with H frame for mounting Structure(Dwg No. BESCOM/GM/QS&S/22 Dtd 24.11.2018), ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 16 SL.No-215 Item No-24.04) & ( As per ESCOM's CSR- 2025-26 page No- 16 SL.No-217 Item No-24.06) Set 3 23987 71961.00 Not updated in new SR
A.8 11kV Switch Gear 0.00
a) 11 kV MCVCB, 350 MVA, 25 kA, 1250 A incomer, 800 A feeder (SCADA compatible)Incommer (KPTCL 25-26, Page No:12 Sl.No:237) No 1 869184 869184.17
b) 11 kV MCVCB, 350 MVA, 25 kA, 1250 A incomer, 800 A feeder (SCADA compatible) Feeder (KPTCL 25-26, Page No:12 Sl.No:238) No 3 773343 2320027.50 Not updated in new SR
c) 11 kV MCVCB, 350 MVA, 25 kA, 1250 A incomer, 800 A feeder (SCADA compatible) Bus Coupler (KPTCL 23-24, Page No:29, Sl.No:4, item No:4.8) No 1 752412 752411.67 Not updated in new SR
d) Annunciator Panel for the following combinations (for both MCVCB & PCVCB), 1IC+4F+1CB (As per KPTCL SR-2025-26, No- 13, SL.No-251) No 1 151922 151921.67 Not updated in new SR
A.9 MOUNTING STRUCTURES: With including fabrication and galvanisation. 0.00
a) Mounting Structure: 33KV, 800A, 25 KA Class Double Break manually operated ISOLATOR Live point height 3750 mm - 2Nos. (As per KPTCL SR- 2025-26, No- 02, SL.No-16) ii) (The weight of structure is 0.240t X2 Nos=480t) t 0.240 106667 25600.00
b) Mounting Structures:33KV Potential Trasformers -0.142x 3Nos =0.426 t (As per KPTCL SR 2025-26, Page No-245 Sl.NO:I,Item.No:E (3)(d), As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0 106667 0.00
c) Mounting Structures:33KV Current Trasformers- 0.142x 3Nos =0.426 t As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.426 106667 45440.00 0.246
d) Mounting Structures:33KV Lightning Arrestors - 0.082 x 3 Nos =0.0.246 tAs per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.246 106667 26240.00
e) Mounting Structures: P.I. Support (33kv side): 0.082x 9 Nos =0.738 t As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.492 106667 52480.00 0.492
f) Mounting Structures:11KV NCT 1 No. 0.146x 1 No =0.146 t As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.146 106667 15573.33
g) Mounting Structures:High P.I. Support (11kv side) 6 Nos As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.66 106667 70400.00
h) Mounting Structures:High P.I. Support (11kv side),2 Nos Harizontal cross arm for support of 11 KV 3CX400 Sq.mm XLPE U.G cable 0.22x 2 Nos =0.44 t As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.22 106667 23466.67
i) Bolts & Nuts for all Station Mounting Structures, such as, A)3T1- (0.017t), 3B1 (0.010t), As per KPTCL SR 2023-24, Page No. 244, Sl. No. I; Item No. (D)(i.ii). B)33KV PT (0.010t X 3 =0.000t)Asper KPTCL SR 2023-24, Page No. 245,Sl. No. I; Item No.(E)3 (d). C) 33KV CT (0.010t X 3 =0.030t) Asper KPTCL SR 2023-24, Page No.245,Sl. No.I; Item No.(E)2 (d). D) 33KV LAs( 0.005X3=0.015) Asper KPTCL SR 2023-24, Page No.245,Sl. No.I; Item No. E) 4(d). E) 33KV PI (0.005x 6 =0.030 t) ( Asper KPTCL SR 2023-24,Page No-247 Sl.NO:II, Item.No:E (iv), F)11KV NCT(0.011x 1 No =0.011t) (Asper KPTCL SR 2023-24, Page No-247 Sl.NO:II, Item.No:D(viii), G)11KV High P.I(0.011x 3 No =0.033t). (Asper KPTCL SR 2023-24, Page No-247 Sl.NO:II, Item.No:E(viii), (Bolts & Nuts Rate, As per KPTCL SR 2023-24; Page No-43;Sl.No.18 Item No.18.3) Rs 142780.00t t 0.129 118983 15348.85 Not updated in new SR 0.129
A.10 b) S.M. Rail angle for Transformer plinth ( 2 nos. of 3m long) SM rail. (As Per KPTCL SR-2023-24, Page No:116, Sl.No.10, Set Rs=1626.00) and .M.S angle 75 x 75 x 6 mm angle iron 8 mtr long 0.2 MT each.(As Per PWD Electrical SR-2023-24, Page No:19, Sl.No.5.40, Item No:5.41.3, Per Mtr Rs:555 X 8 = Rs.4440.00) ,(1626+4440=6066.00) Set 1.000 5055 5055.00 Not updated in new SR
A.11 Conductors 0.00
a) Lynx ACSR (30/2.79 mm Al + 7/2.79 mm St), Std Wt: 842 Kg/KM As per KPTCL SR- 2023-24, No- 02, SL.No-23) Kms. 0.250 187500 46875.00
b) Coyote ACSR (26/2.54 mm Al + 7/1.90 mm St), Std Wt: 521 Kg/KM As per ESCOM's CSR- 2025-26 33KV page No- SL.No- Item No-22.8)(Extracted from KPTCL SR) Kms. 0.250 135537 33884.25
A.12 11KV ODS: 0.00
a) 9 Mtr. Long, 145kg RCC pole for 11KV ODS ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 3 SL.No-1 Item No-1.01) Nos 0 6276 0.00 Not updated in new SR
b) RCC Pole - 8 Mtr Long, 115 Kg WL for LED Light ( As per ESCOM's CSR- 2025-26. page No- 3 SL.No-3 Item No-1.03) Nos 0 4706 0.00 Not updated in new SR
A.13 33 kV side Station Structure 0.00
a) 11 Mtrs long I Beams of size (300*150mm)-vertical (4 nos.) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) MT 1.608 106667 171520.00 Not updated in new SR #REF! 1.316 1608
b) 9 Mtrs long I Beams of size (300*150mm)- (6 nos.) for harizontal structure (As per As per KPTCL SR-2025-26, No- 02, SL.No-16) weight 0.329*4=1.316MT MT 1.316 106667 140373.33 Not updated in new SR 36.53 328.77
c) supply of Galvanised Bolts & Nuts (KPTCL 23-24, Page No:43, Sl.No:18, item No:18.3) MT 0.18 118983 21417.00 Not updated in new SR
A.14 11 KV D.P.Structures: 0.00
a) D.P. Structures with hardware consisting of double power X-arms, horizonontal cross brace, cross braces, back cleat, strain plate, bolt & nuts, painted with two coats of metal primer and aluminium paint, etc as per drawing. ( As per ESCOM's CSR- 2025-26. page No- 17, SL.No-225 Item No-26.02) Set 3 7374 22122.00
A.15 Control Cable with Accessories: (With glands/lugs/ferruels) 0.00
a) 19 Core 2.5 Sq.mm (As per KPTCL SR- 2025-26, No- 10, SL.No-181) . Kms. 0.555 590833 327912.50
b) 4 Core 6 Sq.mm (As per KPTCL SR-2023-24, Page No:40 Sl No-13, Item No:13.8, HSN Code:8544, Rs:247*1000=.247000 Total Rs =247000) Kms. 0.345 205833 71012.50 Not updated in new SR
c) 4 core 2.5 Sq.mm As per KPTCL SR-2025-26 No- 10, SL.No-176) Kms. 0.200 149167 29833.33
d) 2 core 2.5 Sq.mm As per KPTCL SR- 2025-26, No- 10, SL.No-175) Kms. 0.640 92500 59200.00
e) 10 Core 2.5 Sq.mm As per KPTCL SR- 2025-26, No- 10, SL.No-179) Kms. 0.070 340833 23858.33
A.16 Insulators & Hardware materials: 0.00
a) Pad clamp for Coyote ACSR As per As per ESCOM's CSR- 2025-26. page No- 7 SL.No-77 Item No-10.09 Nos 12 734 8808.00
b) Pad clamp for Lynx ACSR As per KPTCL SR- 2025-26, No- 3, SL.No-45) Nos 42 725 30450.00
c) T clamp for Coyote ACSR ( As per ESCOM's CSR- 2025-26. page No- 7 SL.No-75 Item No-10.07) Nos 12 426 5112.00
d) T clamp for Lynx ACSR As per KPTCL SR- 2025-26, No- 5, SL.No-87) Nos 45 527 23700.00
e) 33KV CT bimetalic clamps for Lynx ACSR (As per present market rate) Nos 6 1000 6000.00
f) NCT Pad Clamp As per KPTCL SR- 2025-26, No- 16, SL.No-327) Nos 1 849 849.17
g) Post Insulator Clamps As per KPTCL SR- 2025-26, No- 5, SL.No-74) Nos 3 846 2537.50
h) Terminal Connector Clamps Suitable for 36 kV class bushing to suit Coyote / Lynx conductor for HV Bushings of Power Transformers (Asper KPTCL SR-2023-24, Page No 135, Sl.No-E Item No-viii HSN Code:8536 Total Rs =512) Nos 3 427 1280.00 Not updated in new SR
h) Terminal Connector Clamps Suitable for 12.1 kV class bushing to suit Drake conductor for Bushings of Power Transformers (As per KPTCL SR-2023-24, Page No 135, Sl.No.2E Item No-ix HSN Code:8536 Total Rs.1113/-) Nos 4 928 3710.00 Not updated in new SR
i) Strain Clamp for Lynx ACSR,( As per ESCOM's CSR- 2025-26. page No- 5 SL.No-46 Item No-5.16) Nos 55 588 32340.00 Not updated in new SR
j) Solid Core Bus Post Insulator 33 kV As per KPTCL SR- 23-24, No- 11, SL.No-186) Nos 6 3060 18360.00
k) 70 KN Disc Insulators Ball and socket type ( As per ESCOM's CSR- 2025-26. page No- 82 SL.No-25 Item No-6.03) Nos 55 390 21450.00
i) I bolts (As per present market rate) Nos 30 55 1650.00
A.17 Ground Mat & Earthing : 0.00
a) Grounding of equipment by providing Cast iron pipe of 100 mm ID 13 mm thickness, 2.75 metre long with 2 part clamp out of G.I. Flat 50 X 6 mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor) (As per KPTCL SR-2023-24, Page No:115, Sl.No-6 Item No:c Material Rs-12792+3491 Labour Set 15 13569 203537.50 Not updated in new SR
b) Supplying & providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc.,.(As per KPTCL SR-2023-24, Page No:124, Sl.No-26 Item No:i Material Rs-1499.00 Each 15 1249 18737.50 Not updated in new SR
c) Grounding of equipment with 50X6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of Earthing with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:i Material Rs-335.00 Rmt 300 279 83750.00 Not updated in new SR
d) Supplying and laying of MS Flats of various sizes, welding and applying ACB paint to welded portion and covering with sodium bentonite clay as per the drawing/standard specification and consolidation (MS Flat of size 50x6 ) (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:f Material Rs-404.00 m 350 337 117833.33 Not updated in new SR
A.18 11kV, 3X400 Sqmm Core, XLPE HTUG Cable (ROUND Armoured Cable) 0.00
a) 11 kV, 3x400Sqmm Core, XPLE HTUG Cable with pressure extruded inner sheeth, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armouring wires dia and Resistivity as per IS-3975 ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 128 SL.No-1) Kms. 0.110 2857768 314354.48 Not updated in new SR
b) Cable Covering Tiles 250x125x40 mm or 125x125x40mm. ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 128 SL.No-5) Nos 100 8.98 898.00 Not updated in new SR
c) Artificial/Manufacture Sand (Extracted from Vol-1, PWD SR Sl No. 62),( As per ESCOM's CSR- 2025-26 33KV Material. page No- 128 SL.No-6) Cmt 20 1620 32400.00 Not updated in new SR
d) GI Pipe, 150 mm Dia for drain crossing, cable raising etc., (( As per ESCOM's CSR- 2025-26 33KV Material. page No- 128 SL.No-9) Mtr 16 1532 24512.00 Not updated in new SR
e) Route and Joint indicating stones ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 128 SL.No-10) Nos 10 117 1170.00 Not updated in new SR
11kV Jointing and Cable Termination Kits 0.00 Not updated in new SR
f) Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3X400 Sqmm As per ESCOMs SR- 2025-26, No- 20 of 50, SL.No-419) Per Kit 4 4694 18776.00 Not updated in new SR
g) 11KV, 3 Core, 240 Sqmm XLPE HT UG cable (Round Armord). as per IS-3975 As per ESCOMs SR- 2023-24, No- 15 of 50, SL.No-321) Kms 0.105 4218 442.89 Not updated in new SR
h) Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3X240 Sqmm (As per ESCOMs SR- 2025-26, No- 32, SL.No-425) Per kit 3 4659 13977.00 Not updated in new SR
i) Heat Shrinkable Indoor Type Cable Termination Kit for XLPE Cable 3X240 Sqmm (As per ESCOMs SR- 2025-26, No- 33, SL.No-428) Per kit 3 4110 12330.00 Not updated in new SR
A.19 Miscellaneous items 0.00
a) Caution/Danger Board As per ESCOMs SR- 2025-26, No- 52, SL.No-710) Nos 6 131 786.00
b) Phase plates (As per KPTCL SR 2023-24, Page No.43, Sl. No.19, Item No,19.1, Rs.528/- Set (3 Nos) 3 440.00 1320.00
c) Name Plates for equipment/Earth Pit (As per present market rate due to non availability of rates in the current SR) Nos 20 250.00 5000.00 Not updated in new SR
d) Name plate for feeders and banks (As per present market rate due to non availability of rates in the current SR) Nos 4 250.00 1000.00 Not updated in new SR
A.20 FIRE FIGHTING EQUIPMENT (with necessary mounting stand) 0.00
a) Foam type extinguisher (Mech) 9.00 Ltr. Capacity. (As per KPTCL SR 2023-24, Page No.74 Sl.No.51, Item No,51.1.2, Rs.4118/- Nos 4 3431.67 13726.67 Not updated in new SR
b) Carbon dioxide type 4.5Kg. Capacity (As per KPTCL SR 2023-24, Page No.74 Sl.No.51, Item No,51.5.2, Rs8691/-) Nos 4 7242.50 28970.00 Not updated in new SR
A.21 Station Service Equipments: 0.00
a) Single line diagram Photo sheet paper (Size 20x20 inch) (As per present market rate) Nos 2 2000.00 4000.00 Not updated in new SR
b) Supplying and installation of Rubber mat 1mtr x 1mtr -1Omm thick.complete including cost of materials, labour, usage charges of machinery complete as per specifications. (As per PWD SR 2023-24, Page No.93 of 105 Sl.No.15, Item No,15.117, Rs 1900/-) Nos 5 1583.33 7916.67 Not updated in new SR
Total material cost 7974811.14 8706840.62
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
PART-B (Electricals Erection Works)
Sl. No. Particulars Unit Qty Rate Amout in Rs.
B.1 a) Power Transformers: Moving the Transformer to the plinth. (15 MT for 10 mtrs) on ramp. (As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(a)) Rs-80/- per MT/ mtr 300 67 20000 300
b) Assembly of Transformer parts like bushings, radiators, filling oil into Transformer etc., for the total weight of the Transformer. (As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(b)) 1134.00 MT 15 945 14175 150
c) Filtration of oil using filter set of the contractor, to bring the insulation value to I.E. Specifications.(As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(d)) Rs-7.00 ltrs 3500 6 20417
d) 5 MVA to 6.3/8 MVA Tr Wiring: Identification of wires,Wiring of Transformer marshalling box, bucholtz relay, OLTC upto control panel Ferruling crimping and termination of wires. Wiring of Protective Devices, OLTC, RTCC , fixing Thermometer, etc.,including assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour,Page No-116, Sl.No-9, Item No-(f&i)) 6708 per transfor mer 1 5590 5590
e) Fabrication of Transformer railing & embedding in Transformer plinth. (As per KPTCL SR-2023-24 Labour, Page No-116, Sl.No-10,Rs-1626 Set 1 1355 1355
B.2 a) 33KV SF-6/ VCB Breakers: Breaker Erection, assembly, alignment & wiring of breakers with its connected equipments including movement from the point of unloading to the point of erection. (As per KPTCL SR-2023-24 Labour,Page No-117, Sl.No-13, Item No-(a) Rs-5934 Per Set 1 4945 4945
b) Assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour, Page No-117, Sl.No-13, Item No-(b) Rs-1938.00 Set 1 1615 1615
c) Wiring : Identification, Ferruling crimping and termination of wires in Breaker & Wiring up to control panel/Relay panels. (As per KPTCL SR-2023-24 Labour,Page No-117, Sl.No-13, Item No-(c) Rs-8487 Set 1 7073 7073
B.3 a) Control Panels : Erection of control panel, auxilary panel, carrier cabinet etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection.(As per KPTCL SR-2023-24 Labour,Page No-120, Sl.No-23, Item No-(a) Rs-4191) Nos. 1 3493 3493
b) Wiring & Assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour,Page No-120, Sl.No-23, Item No-(b) Rs-7612.00 Nos. 1 6343 6343
B.4 a) Erection of CTs and wiring including movement from the point of unloading to the point of erection. (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 a) Rs-2199 Set (3 Nos) 1 1833 1833
b) Assisting in Testing & Commissioning: (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 (b) Rs-768.00 Set (3 Nos) 1 640 640
c) Welding work for alteration of existing PI mounting structure to errect the incomer Current Transformers (As per present market rates) No's 3 417 1250
B.5 a) Erection of NCTs including movement from the point of unloading to the point of erection with grounding connections (As perKPTCL CSR 23-24, Labour, Page No: 118, Sl No.:15(a) Rs-733.00 Set 1 611 611
b) Assisting in Testing & Commissioning:(As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.:15(c) Rs-99.00 Set 1 83 83
B.6 a) Releasing of Existing PTs and wiring including movement from the point of unloading to the point of erection. (As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.: 14 (a) Rs-2199.00 Set (3 Nos) 0 1833 0
b) Re-Erection of Existing PTs and wiring including movement from the point of unloading to the point of erection. (As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.: 14 (a) Rs-2199.00X90%=1979.10 Set (3 Nos) 0 1649 0 1979.10
c) Assisting in Testing & Commissioning: (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 (b) Rs-768.00 Set (3 Nos) 0 640 0
B.7 a) Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection (33 KV) (As per KPTCL CSR 23-24, Labour, page No119, Sl.No:18 )Rs.333/- Set 1 278 278
b) 9 KV, 5 KA class (Station type) (11kv) (As per ESCOMS SR 23-24, Labour, page No: 48 of 81, Sl.No:101, item no: 13.06) Rs-119.00 Set (3 Nos) 3 99 298
B.8 1) 33 KV Isolators : 0 0
a) Erection of Isolators (33 KV) Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection.(Upright type),( As per KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 A(i) ,) Rs-1319.00 ) Set 1 1099 1099
b) Assisting in Testing and Commissioning ( KPTCL CSR 23-24, Labour, Pg No:119 , Sl No.: 17 E(i) ,) Rs-191/- Nos 1 159 159
2) 11KV Isolators: 0 0
a) Erection of 400A, special roster switch with H-frame & clamps to be mounted on DP (As per ESCOM SR- 2025-26, Labour, Pg No:58 Sl No.: 37 ,itme no: 2.09) (Rs - 288) (Total - 1082+288=1370) Nos 0 1370.00 0
b) Erection of 11 kV, 400 Amps Double Break GOS (As per ESCOM SR- 2025-26, Labour, Pg No:58 Sl No.: 37 ,itme no: 2.09) (Rs - 288) (Total - 1082+288=1370) Nos 3 1370.00 4110
B.9 a) 11 KV Switchgear : Erection, alignment and fixing to the foundation, indoor/outdoor 11KV switchgear Panel/unit including movement from the point of unloading to the point of erection. (1Bank+3 feeders+busu coupler) (As per KPTCL SR 23-24, Labour, page No: 121, Sl.No:24 a (i) ) Rs-2081/-) Per Panel 5 1734 8671
b) Wiring and assisting in Testing & Commissioning: (As per KPTCL SR 23-24, Labour, page No: 122, Sl.No:24 b (i) ) Rs-941.00 Per Panel. 5 784 3921
B.10 a) 33KV Station structures: 0
Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for 3T1 Tower ,3B1 Beam,G.O.S., CTs, PTs LAs, 11KVNCT, High P.I, etc. (As per KPTCL SR 23-24, Labour, Page No: 116, Sl No.: 8, (b) , Rs-5723.00 t 2.43 3257 7915
B.11 a) Bus Formation 0
Formation of cross bus in each individual bay using Lynx/Coyote -Single/Double conductor with fixing of insulators, spacers, levelling the strung conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus. ( As per KPTCL SR 23-24, Labour, Page No: 122, Sl No.: 25) Rs-7364.00 (Incuding 33KV Bus Formation) Per bay 4 6137 24547
B.12 a) 11KV ODS: 0
1) Digging of Pit 1.8 Mtr depth (Ordinary Soil) for errection of 9Mtr 11KV ODS pole- ESCOMs Labour (As per ESCOMs Labour SR-2025-26 Page No- 57 Sl.No-1 Item No-1.1.1 RS- 561) 2) Errection of 9 Mtr. Long, 145kg RCC pole for 11KV ODS. (As per ESCOMs Labour SR-2025-26 Page No- 58 Sl.No-30 Item No-2.02) RS-991 (Total Rs 561+9991=1552) Nos 0 1552 0
b) 1) Digging of Pit 1.6 Mtr depth (Ordinary Soil) for erection of 7.5/8 Mtr Long Steel/RCC pole for LED Light (As per ESCOMs Labour SR-25-26 Page No- 57 Sl.No-5 Item No-1.2.1 RS-449) 2)Errection of RCC Pole - 8 Mtr Long, 115 Kg WL. (As per ESCOMs Labour SR-2025-26 Page No- 58 Sl.No-29 Item No-2.01) RS-821 Total Rs-1270 (Total Rs 449+821=1552) Nos 0 1270 0
c) Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint for 11 KV ODS mounting structure using 50 x 100 x 50 x 6 mm C channel MS, each 4.0 mtr long , As per PWD Electrical Page 19 Sl.No-5.41.4 Rs-Per Mtr-756.00 28NosX4Mtr=112 Mtr Mtr 0 630 0 112
B.13 Erection of 2 Pole DP Structure using RCC/PSCC Pole 9 to 10 Mtr long (As per ESCOMs Labour SR-2025-26 Page No- 58 Sl.No-34 Item No-2.06) Per Structure 3 3682 11046 1403 only dp 1341
B.14 Laying of control cables from equipments to control panels. 0
a) 19 Core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 555 13 6938
b) 4 Core 6 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 345 13 4313
c) 4 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 200 13 2500
d) 2 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 640 13 8000
e) 10 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 70 13 875
A.15 11kV, 3 Core, XLPE HTUG Cable (ROUND Armoured Cable) 0
a) a) Cable trench excavation, 22x0.6x1=13.2, Ordinary soil (HESCOM SR-2025-26,Labour, Cost data sheet-23, Sl No- 11 (a) . Cmt 0 228 0
b) Laying of cable in trench. (HESCOM SR-2025-26,Labour, Cost data sheet-23, Sl No- 11 (b) . KM 0.110 58866 6475
c) Refilling and consolidation (HESCOM SR-2025-26,Labour, Cost data sheet-23, Sl No- 11 (g) . Cmt 20 143.0 2860 40000
d) Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3X400 Sqmm (HESCOM SR-2025-26,Labour, Cost data sheet-23, Sl No- 11 (g) . Per Kit 4 2368 9472
e) Covering the cable with tile (As per KPTCL SR- 2023-24, Page No- 45 of 50, SL.No-257) KM 0.020 4491 90
f) Spreading Sand and forming with Sand round the Cable (BESCOM SR-2023-24,Labour,Cost data sheet-284 KM 0.150 13220 1983
g) Laying of GI Pipe (HESCOM SR-2025-26,Labour ,Cost data sheet-23, Sl No- 11 (i) Rs:93 Mtr 16 83 1328
h) Laying of Route and Joint indicating stone (As per KPTCL SR- 2025-26, Page No- 34 of 50, SL.No-2, 55 of 50, SL.No-258) Nos 10 103 1030
i) 11KV, 3 Core, 240 Sqmm XLPE HT UG cable (Round Armord). As per ESCOM SR- 2023-24, Page No- 41 of 50, SL.No-172) . Mtr 105 57 6000
j) Cable Termination Kit Outdoor HS Type Suitable for 240 Sqmm Cable HESCOM SR 23-24 Labour charge page No: 42 of 50 Sl.No: 183, Nos 3 2368 7104
k) Cable Termination Kit Indoor HS Type Suitable for 240 Sqmm Cable HESCOM SR 23-24 Labour charge page No: 42 of 50 Sl.No: 183, Nos 3 2368 7104
A.16 Miscellaneous items 0
a) Fixing Caution/Danger Boards (As per ESCOM SR- 2025-26, Labour, Pg No:60 Sl No.: 63 ,itme no:5.15) Nos 6 71 426
b) Fixing Phase Plates As per KPTCL Labour SR 23-24,Pg No.113 ,Sl No.3(c) Rs-238 Set (3Nos) 3 198 595 71.5986
c) Fixing Name Plates for equipment/Earth Pit ,KPTCL SR 21-22, page No-09 of 27 Sl No-7 Item No:- (d), Labour Charge Rs.54 Nos 20 45 900
d) Name plate for feeders and banks KPTCL SR 21-22 , Labour Charge No-09 of 27 Sl No-7, Item No:- (d),Rate Rs.54 Nos 4 45 180
A-17 Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. As per PWD Ele SR 2-2023-24 Page No-56 Of 105,Item No:13.5 Each 0 135 0
A-18 a) Existing 63KVA Auxillary Transformers 0
Releasing of Existing 63KVA station Auxillary TC Asper BESCOMs SR-2023-24 Labour Charge Cast Data sheet No-25 Sl No-5, Rate Rs.1828X90%= No 0 1371 0 1073.70
b) Re-Erection of Existing 63KVA Station Auxillary TC (As per KPTCL SR- 2023-24, Page No-35 of 50, SL.No-46) No 0 1523 0
Total Labour cost 219635.77 196888.88
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
PART-C-(CIVIL WORKS)
Sl No. Item Description Unit Qty Unit Price (Rs) Total Price (Rs)
C SCHEDULE OF ITEMS FOR ASSOCIATED CIVIL WORKS AND STRUCTURES:
C.1 Cable Trenches including road crossing :
a) RCC Cable duct for laying of control cables with cable tray.(Duct size:1 mtr WidthX 1 mtr DepthX 37 Mtr Length including 33 KV and 11 KV side) Mtrs 0.00 6388 0.00
b) b) Providing and Laying RCC Hume pipe sub ducts using NP 2 class 300mm dia Hume pipe including cost of Excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmtrs 0.00 711 0.00
c) Cable duct covers RCC made with suitable size to cover the duct length of 35 Mtrs ( of Size 1m x 1m x 0.15m) Nos 0.00 1412 0.00
C.2 SITE SURFACING: Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer- in-charge of works as per the standard procedure(As per KPTCL SR 2023-24,Page No.158,Sl.No.1) Cmt 73.80 1478 109039.50
C.3 Foundations: Engineering, supply of all labour,material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grouting underpinning etc ,for the following works 0 0.00
a) 9 mtrs long RCC poles for ODS (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.3434,Coping Rs.312) No's 0 3382 0.00
b) 8 mtrs long RCC poles for station Yard lights (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.1498+Coping Rs.312) No's 0 1760 0.00
c) 33KV CT support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 4708 14125.00
d) 33KV Surge arrestor support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 4708 14125.00
e) PI support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 4708 14125.00
f) 11 KV NCT mounting structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 1 4951 4950.83
g) 33KV Isolators support structure(0.95 mtr X 0.45 mtr X 1mtrDepth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Set 1 4728 4728.33
h) PI support structure for raising the U.G cable (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel No. 6 4708 28250.00
i) 11 Mtrs long I Beams of size (300*150mm)-vertical (4 nos.) (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel No. 4 4708 18833.33
j) 9 Mtrs long I Beams of size (300*150mm)- (6 nos.) for harizontal structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel No. 6 4708 28250.00
C.4 Transformer foundation and associated rail track: 0 0.00
Design, Engineering,supply of material / equuipment, labour and construction of Tr. Foundation by providing all associated works, rail tracks jacking pads, anchor block RCC, PCC misscellanellaneous structural steel including MS, grouting gravel filling pylon support system and other items not mentioned herein, but required for the completion of the work as per the technical spcfication and drawings 0 0.00
a) 5 MVA, 33/11 KV Transformer (3.3 mtr Width X 3.3 mtr Length X 3 mtr Depth) Nos 1.00 256006 256005.83
C.5 a) SF-6 Breaker foundation, 33KV SF-6 Breaker foundation as per approved design and drawing including supply of material and labour Nos 1.00 21873 21872.50
C.6 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: 0 0.00
a) PVC pipes 63mm dia., 6 kg/sqcm & class 3 Mtrs 25.00 134 3354.17
b) PVC pipes 75mm dia., 6 kg/sqcm & class 3 Mtrs 25.00 183 4583.33
C.7 a) Earth mat formation : 0 0.00
Excavation, formation, refilling. CMT 304.00 168 51173.33
C.8 a) Design, Engineering,supply of material / equuipment, labour and construction of 11 KV out door PCVCB foundation by providing all associated works as per standard and approved specification. No's 5.00 36022 180108.33 23573(As per estimate)
b) Design, Engineering,supply of material / equuipment, labour and construction of 11 KV out door Capacitor Bank cells foundation by providing all associated works as per standard and approved specification. Set 1.00 22183 22183.33
C.9 Station security fencing with foundation Rmtrs 0.00 4462 0.00
Total Civil cost 775707.83
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
9 tender capacity.xlsx
Others - 9 tender capacity • 0.01 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
10 work done.xls
Others - 10 work done • 0.03 MB
2 section 1 IFB 1213 call 2.doc
Others - 2 section 1 IFB 1213 call 2 • 1.41 MB
4 section iii GCC INDENT 1213 call 2.doc
Others - 4 section iii GCC INDENT 1213 call 2 • 0.14 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
11 Athani 5MVA Final.xlsx
Others - estimate • 0.94 MB
7 Annexures 1213 call 2.doc
Others - 7 Annexures 1213 call 2 • 0.16 MB
5 section iv ECC INDENT 1213 call 2.doc
Others - 5 section iv ECC INDENT 1213 call 2 • 0.09 MB
8 technical specification 1213 call 2.doc
Others - 8 technical specification 1213 call 2 • 0.58 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
1 NIT INDENT 1213 call 2.doc
Others - 1 NIT INDENT 1213 call 2 • 0.14 MB
6 section v SCC INDENT 1312 call 2.doc
Others - 6 section v SCC INDENT 1312 call 2 • 0.11 MB
3 section ii ITB 1312 call 2.doc
Others - 3 section ii ITB 1312 call 2 • 0.11 MB
Download all tender documents and submit your bid