Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAccepted-Finance 3 C DR JAGABANDHU LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹37.8 L+₹57,680.45 (1.55%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹38.0 L+₹76,287.04 (2.05%)Rejected-Finance 14 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹37.2 L
EMD Value
₹74,426
Closing Date
3 Aug 2026, 1:00 pmClosed
EE-I,WKED,PWDte.
New Secretariat Building, C Block, 4th floor 1, K.S Roy Road, Kolkata-700001
Annual Maintenance of the Electrical Installations of both non-residential and residential buildings and Sub-stations for Main Building and Annex Building in the premises of Honble High Court, Calcutta (Round the clock).
2026_WBPWD_5016415_1
WBPWD/EE-WKED/NIT-28/2026-27
Open Tender
ELECTRICAL WORKS M/R
Percentage
365 days
High Court, Calcutta
Please refer Tender documents.
7 documents required · 7 mandatory
₹74,426
Office of the EE, WKED, PWDte.
10 Aug 2026
6 Jul 2026
5 Aug 2026
6 Jul 2026
3 Aug 2026
10 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual Maintenance (Round the clock) of all internal and external electrical installation works within the premises of Main & Annex building of Hon'ble High Court, Calcutta incl. Sub-Station [feeding power to Main & Annex building and partly of CB building] everyday including saturday, Sunday & Govt. Holidays as per attached Terms & condition by deputing required number of Highly-skilled Electrician, Skilled Electrician, Semi-Skilled Electrician & unskilled labour in the shifts per day as detailed given below for period of Twelve months | |||||
| 1.01 | Charges for providing 1 no. Highly skilled Electrician in one shift per day for 3 nos. shifts per day on all days ((a) Shift-1 (from 6 a m. to 2 p.m.),(b)Shift-2(from 2 p.m to 10 p.m.) and (c) Shift-3(from 10p.m. to 6 a.m.) as per attached terms and conditions. | 3 | heads | 23,908 | ₹71,724 |
| 1.02 | Charges for providing 1 no. skilled Electrician in one shift per day for General shift on all days (from 9 a.m. to 2 p.m.)as per attached terms. and conditions. | 1 | head | 21,706 | ₹21,706 |
| 1.03 | Charges for providing 1 no. Semi-skilled Electrician in one shift per day for 3 nos. shifts per day on all days ((a) Shift-1 (from 6 a.m. to 2 p.m.),(b)Shift-2(from 2 pm to 10 p. m.) and (c) Shift-3(from 10p.m. to 6 a.m.)Jas per attached terms and conditions | 3 | heads | 19,729 | ₹59,187 |
| 1.04 | Charges for providing 1 no. of Un-skilled Personnel in each every shift per day for 3 nos shifts per day on all days ((a) Shift-1 (from 6 a.m. to 2 p.m.)--2nos., (b)Shift-2(from 2 pm to 10 p.m.)--2nos., (c) Shift-3(from 10p.m. to 6 a.m.)--1 no.(d) Shift-4 as General shift(from 9 a.m. to 5 p.m.)--1no as per attached terms and conditions. | 6 | heads | 17,931 | ₹1,07,586 |
| 2 | Add. G.S.T.@ 18% on total of item | 1 | item | - | - |
| 3 | Add. LWC.@ 1% on total of item | 1 | item | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_5085874.xls
BOQ • 0.28 MB
WBF-2911.pdf
Tender Documents • 0.53 MB
Terms_Conditions_28.pdf
Additional Documents • 0.05 MB
Corrigendum_nit_28_2026_27_DateExtension_Upload.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .