| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹3.1 Cr+₹5.4 L (1.79%)Rejected-Finance | ₹3.1 Cr+₹5.4 L (1.79%) | L2 | Rejected-Finance Highest of L1 |
| 3 | L3₹3.1 Cr+₹9.1 L (3.04%)Rejected-Finance JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹3.1 Cr+₹9.1 L (3.04%) | L3 | Rejected-Finance Highest of L1 |
| 4 | L4₹3.1 Cr+₹10.2 L (3.39%)Rejected-Finance | ₹3.1 Cr+₹10.2 L (3.39%) | L4 | Rejected-Finance Highest of L1 |
| 5 | L5₹3.1 Cr+₹11.0 L (3.65%)Rejected-Finance | ₹3.1 Cr+₹11.0 L (3.65%) | L5 | Rejected-Finance Highest of L1 |
Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
12 Dec 2019, 3:00 pmClosed
SE ICC JHANSI
OFFFICE OF SE ICC CIVIL LINE STATION ROAD JHANSI
Development Works In Rehabilitation Area Of Jarawali Village In Submergence Of Bhaoni Dam
2019_UPIDC_406352_1
02/SE/2019-20
Open Tender
Civil Works
Item Rate
120 days
Bhaoni Dam Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
EE ICD-1
₹7.9 L
24 Feb 2021
22 Nov 2019
13 Dec 2019
22 Nov 2019
12 Dec 2019
22 Nov 2019
Amount
Earth work in excavation in Mar ,Kabar Rankar and kankar mixed soil in foundation including initial lead & lift with proper dressing & disposal of excavated soil with all cost of labour, T&P required for proper completion of work.
Excavation in Granite rock by blasting including cost of drilling, explosives, proper stacking, labour, T&P required for proper completion of work.
Supply & laying GSB material with mechanical compaction with all cost of material, labour, T&P required for proper completion of work.
E/W in filling in sub grade in M.K.R. & kankar mixed Soil with excavated earth including 1.0 km. lead & initial Lift including dressing making profile & mechanical compaction with proper completion of of the work.
Laying C.C. 1: 3 : 6 (M-10) including mixing, laying & curing with all cost of material, labour, T&P required for proper completion of work.
Laying cement concrete 1:2:4 CM (M15) by mechanical mixer including all cost of material, labour and T&P etc. required for proper completion of work.
R.C.C. 1:1.5:3 (M-20) including mechanical mixing, laying, vibration & curing with all cost of T&P, material, labour, required for proper completion of work but excluding centering, shuttering & Reinforcement.
R.C.R khanda stone masonry in 1:3 cement mortar including all cost of material, labour and T&P etc.
Dry stone boulder pitching including all cost of material, labour and T&P etc.
Raised cement pointing in 1:2 cement mortar including all cost of material, labour and T&P etc.
Centering, shuttering including all cost of T&P, material, labour, with for proper completion of work .
Reinforcement(Steel) for R.C.C. 1:1.5:3 work including cutting, placing, & binding with G.I. wire with all cost of T&P, material, labour, required for proper completion of work .
Providing and fixing 50-100MM dia P.V.C. pipe including all cost of labour, material and T&P etc. @ 5.0 m. C/C Spacing.
Providing and fixing 600MM dia RCC pipe including all cost of labour, material and T&P etc. for pipe culverts
P/fixing India Mark-II Hand pump assembly with boring complete including all accessories with all cost of labour,material & T&P etc
Hari Construction
M/s Anuj Tiwari
M/S TULSIRAM AND COMPANY
M/S BUNDELA ASSOCIATES
SRIVASTAVA CONSTRUCTION
SAKSHAM BUILDERS
C B S CONSTRUCTIONS COMPANY
GHANARAM INFRA ENGINEERS PRIVATE LIMITED
M/S SINGH BROTHER
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .