Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-Finance 8 171 VANDIDHATAM KAMALAPURAM POST OMALUR TK SALEM 636309 | SALEM | SALEM | TAMIL NADU | 636309 | ₹27.5 L | L1 | Accepted-Finance as per financial evaluation |
| 2 | L2₹28.4 LRejected-Finance | ₹28.4 L | L2 | Rejected-Finance as per financial evaluation |
| 3 | L3₹28.8 LRejected-Finance | ₹28.8 L | L3 | Rejected-Finance as per financial evaluation |
| 4 | L4₹29.3 LRejected-Finance | ₹29.3 L | L4 | Rejected-Finance as per financial evaluation |
| 5 | L5₹29.5 LRejected-Finance | ₹29.5 L | L5 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | M.Arumugam L4 | AJS Contractors L2 | A.Panneer Selvam L3 | N & T PROJECT L1 | SKP AND CO L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Strengthening the road from Steel plant road to Veerakaran koil km 0/0-0/420 | ||||||||
| 2.00Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | ||||||||
| 3.00 | KM 0/0 - 0/420 | 252 | m2 | 6 ₹1,512 | 6.17 ₹1,554.84 | 4.5 ₹1,134 | 6.36 ₹1,602.72 | 10 ₹2,520 |
| 4.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | ||||||||
| 5.00 | KM 0/0 - 0/420 | 619 | m2 | 23 ₹14,237 | 22.66 ₹14,026.54 | 15.3 ₹9,470.70 | 23.63 ₹14,626.97 | 30 ₹18,570 |
| 6.00collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | ||||||||
| 7.00 | KM 0/0 - 0/420 | 37.8 | m3 | 145 ₹5,481 | 142.77 ₹5,396.71 | 100 ₹3,780 | 147.19 ₹5,563.78 | 150 ₹5,670 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||||||
| 9.00 | KM 0/0 - 0/420 | 278.55 | m3 | 2,420 ₹6.7 L | 2,358.5 ₹6.6 L | 2,310 ₹6.4 L | 2,431.44 ₹6.8 L | 2,470 ₹6.9 L |
| 10.00Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | ||||||||
Tender Value
₹29.6 L
EMD Value
₹29,600
Closing Date
2 Mar 2026, 3:00 pmClosed
A.Logambal
BDO BP Salem
14th Finance Commission (Saving Fund) - 2025-26- Strengthening the road from Steel plant road to Veerakaran koil km 0/0-0/420
2026_RDTN_665001_1
479-2026-A2
Open Tender
Civil Works - Roads
BDO Office
as per document
3 documents required · 3 mandatory
₹0
₹29,600
Yes
7 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Strengthening the road from Steel plant road to Veerakaran koil km 0/0-0/420
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.specification clause 508
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev- 5
Providing and laying of hot Road Making with Hot Applied Thermoplastic compound with eflectorising glass beads @ 250GMs per Sqm area, thickness of 2.50mm is exclusive of surface applied glass beads as per IRC:35, The Finished surface to be level uniform and free from Streaks and holes etc., Complete as per MORTH&H Specification No.803
Provision for Hecta Metre Stone - Nos
Provision for Sign board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
02.pdf
Tender Documents • 0.78 MB
BOQ_798643.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid