Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹88,049.64Accepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹94,999.03+₹6,949.39 (7.89%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹1.1 L+₹25,165.12 (28.6%)Rejected-Finance GURUGURAM | GURUGRAM | HARYANA | 122001 | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | RRB Constructions L1 | SANTHOSHARIDEVAN AND CO L3 | MURUGAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling of Two Class room ( west face ) RCC Building at P.U.E School Kadachanallur H/O Kadachanallur | ||||||
| 2.00 | Dismantling,Pressed tiles & weathering course as per Sl No.38 B including cost and conveyance of all materials and labour charges etc. completed.-1.00Sqm | 83.16 | Sqm | 46.5 ₹3,866.94 | 45.98 ₹3,823.7 | 45.3 ₹3,767.15 Lowest |
| 3.00 | Dismantling the RCC item clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete.complete. | 17.14 | Cum | 2,750 ₹47,135 Lowest | 4,307.8 ₹73,835.69 | 3,100 ₹53,134 |
| 4.00 | Disposal of RCC Materials of debris with a lead of 10 Km | 17.14 | Cum | 140 ₹2,399.6 Lowest | 200 ₹3,428 | 140.2 ₹2,403.03 |
| 5.00 | Dismantling the Brick work in cement mortar wall and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 31.89 | Cum | 250 ₹7,972.5 Lowest | 283 ₹9,024.87 | 268.5 ₹8,562.47 |
| 6.00 | Disposal of Brickwork Materials of debris with a lead of 10 Km | 31.89 | Cum | 140 ₹4,464.6 | 75 ₹2,391.75 Lowest | 140.2 ₹4,470.98 |
| 7.00 | Dismantling to the Doors and windows with frame and hinges clearing away and carefully stacking materials useful for reuse including disposal of debris with a lead of 10 Km all charges etc complete. | 10.99 | sqm | 140 ₹1,538.6 Lowest | 250 ₹2,747.5 | 153 ₹1,681.47 |
| 8.00 | Dismantling the plain Cement Concrete and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 16.03 | Cum | 410 ₹6,572.3 | 400 ₹6,412 Lowest | 410 ₹6,572.3 |
| 9.00 | Disposal of PCC Materials of debris with a lead of 10 Km | 16.03 | Cum | 140 ₹2,244.2 Lowest | 150 ₹2,404.5 | 140.2 ₹2,247.41 |
| 10.00 | Dismantling the Random rubble masonry work in cement mortar and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 14.63 | Cum | 250 ₹3,657.5 Lowest | 250 ₹3,657.5 Lowest | 270 ₹3,950.1 |
Tender Value
₹1.3 L
EMD Value
₹1,300
Closing Date
11 Sept 2026, 3:00 pmClosed
Block Development Officer (B.P) ,Pallipalayam
Block Development Office Pallipalayam
Dismantling of Two Class room ( west face ) RCC Building at P.U.E School Kadachanallur H/O Kadachanallur in Pallipalayam Block of Namakkal District under General Fund - 2026-2027 PPM_GF-4
2026_RDTN_701357_1
926/2026/A2
Open Tender
Civil Works - Others
Item Rate
90 days
Pallipalayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,300
Yes
15 Oct 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Two Class room ( west face ) RCC Building at P.U.E School Kadachanallur H/O Kadachanallur | - | - | - | - |
| - | Dismantling,Pressed tiles & weathering course as per Sl No.38 B including cost and conveyance of all materials and labour charges etc. completed.-1.00Sqm | 83.16 | Sqm | - | - |
| - | Dismantling the RCC item clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete.complete. | 17.14 | Cum | - | - |
| - | Disposal of RCC Materials of debris with a lead of 10 Km | - | Cum | - | - |
| - | Dismantling the Brick work in cement mortar wall and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 31.89 | Cum | - | - |
| - | Disposal of Brickwork Materials of debris with a lead of 10 Km | 31.89 | Cum | - | - |
| - | Dismantling to the Doors and windows with frame and hinges clearing away and carefully stacking materials useful for reuse including disposal of debris with a lead of 10 Km all charges etc complete. | 10.99 | sqm | - | - |
| - | Dismantling the plain Cement Concrete and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 16.03 | Cum | - | - |
| - | Disposal of PCC Materials of debris with a lead of 10 Km | 16.03 | Cum | - | - |
| - | Dismantling the Random rubble masonry work in cement mortar and clearing away and carefully stacking materials useful for reuse including disposal of debris witha lead of 10 Km all charges etc complete. | 14.63 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Technicalbid.pdf
Tender Documents • 1.04 MB
BOQ_843013.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .