| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 LAccepted-AOC DILIP KONER HOUSE NO N 30 SARAT PALLI NEAR SHYAMPUR DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | L-1 | Accepted-AOC L-1 | |
| 2 | Rejected-Technical DR B R AMBEDKAR COLONY DURGAPUR 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | - | Rejected-Technical Technically not qualified. | |
| 3 | Rejected-Technical 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | - | Rejected-Technical Technically Not Qualified | |
| 4 | Rejected-Technical 23 58 JESSORE ROAD SD COLONY DUM DUM KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | - | Rejected-Technical Technically not qualified. |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
28 Feb 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(P and P)
Office of the GM(P and P), 2nd Floor, Technical Building, Unit 7, DPL, Durgapur, Paschim Bardhaman, West Bengal , Pin-713201.
Cleaning of different Clarifiers in Water Works for the year 2024- 2025.
2025_DPL_817005_1
WB DPL-13.099/6/2025-GM-POW (DPL)-DPL/WW/E-313 Dated- 18.02.2025
Open Tender
CIVIL WORKS
Item Rate
365 days
Water Works, DPL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,200
11 Sept 2025
18 Feb 2025
6 Mar 2025
18 Feb 2025
28 Feb 2025
18 Feb 2025
Amount
Desilting, scrapping and through cleaning of 82’ dia. Accelators and its surrounding channels and sludge lines incl. supply of labour, tools and tackles, hose pipes as per direction of the EIC (Necessary barricading to check the back flow of water into the tank and slugging to holes to avoid wastage of water to be done by the Contractor of his own cost and labour.
Desilting, scrapping and through cleaning of 65’ dia. Clariflocculator of Water Works incl. supply of labour, tools and tackles, hose pipes as per direction of the EIC.
Desilting, scrapping and through cleaning of 60’ dia. Accelator of Water Works incl. supply of labour, tools and tackles, hose pipes etc. completed as per direction of the EIC.
Desilting, scrapping and through cleaning of 50’ dia. Primary Clarifier of Water Works incl. supply of labour, tools and tackles, hose pipes etc. completed as per direction of the EIC.
Desilting, scrapping and through cleaning of 100’ dia. / 32.5 meter dia. Primary Clarifier of Water Works incl. supply of labour, tools and tackles, hose pipes etc. completed as per direction of the EIC.
Desilting, scrapping and through cleaning of 130’ / 142’ dia. Clariflocculator of Water Works incl. supply of labour, tools and tackles, hose pipes etc. completed as per direction of the EIC.
Desilting, scrapping and through cleaning of 172’ dia. Clariflocculator of Water Works incl. supply of labour, tools and tackles, hose pipes etc. completed as per direction of the EIC.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .