Loading…
Loading…
Tender Value
₹98.9 L
EMD Value
₹2.0 L
Closing Date
8 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Ajmer Division: Provision for reliability improvement and upkeep/sustaining of various components/parts of IPS at various stations over Ajmer division.
SNT-AII-46-2025-26-Re-ten
SNT-AII-46-2025-26-Re-ten
Open
24 Months
Ajmer, Rajasthan
₹0
₹2.0 L
11 Jun 2026
11 Jun 2026
24 Jun 2026
authority:- Consignee Inspection charges:-None Payment Terms:- 100% after supply.
Description:- Supply of 1 x 16 Sqmm (Red/Black/Green) multi strand copper power wire as per IS:694:2010 or latest, 127 conductor each dia 0.40 +/- 0.01 with insulation thickness of 1.0 mm and nominal conductor resistance of 1.21 ohms/km and test parameters as per RDSO Specn.No.IRS:S-
incharge. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways(ii) None Payment Terms: 100% on Supply
Description:- Supply of 1 x 25 Sqmm (Red/Black) multi strand copper power wire as per IS:694:2010 or latest, 197 conductor each dia 0.40 +/- 0.01 with insulation thickness of 1.2 mm and nominal conductor resistance of 0.78 ohms/km and test parameters as per RDSO Specn.No.IRS:S-
incharge. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply
Description:- Supply of uncharged Low Maintenance Lead Acid (LMLA) secondary cell, shelf
and bolts etc. Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply. 2V, 300AH
AJMER DIVISION-S AND T/NORTH WESTERN RLY
and distilled water with minimum two charge - discharge cycles, installation of charged batteries in groups & their connection & wiring. The work shall be done as per extant practice of N.W.Rly & instruction of Engineer-in-charge. Detailed measurements of initial charging shall be recorded jointly by contractor & Rly's site-in-charge. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution. 2V 300AH/ 500 AH
Description:- Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197/2008 or latest and conforming to RDSO Drg.No.SDO/ RDSO/E&B/001 dtd.19.09.08 . It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17.2 mm dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. © Copper strip of 150x25x6 mm, to
150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable Inspection: RDSO Inspection Charges:Borne by Railways Payment Terms: 100% after Supply.
Description:- Installation of Unit Maintenance Free Earth as supplied under item no. 13.3 of Chapter 13 of SOR . It includes ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods
micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip- potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specn.No.RDSO/SPN/ 197/2008 or latest and conforming to RDSO Drg.No.S DO/RDSO/E&B/001 or latest. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution and testing. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Schedule () B-NS ITEMS 7407237.85 B 35.00 Numbers 4194.17 146795.95 AT Par 146795.95
AC/DC current and voltage 600VDC/DC with F.F.C. Function facility, Model-4673, Make- Metravi/Fluke or similar. Inspection: Consignee. Inspection Charges: None Payment Terms:100% after supply B 417.00 Metre 278.06 115951.02 AT Par 115951.02
per RDSO Drg. No. SDO/RDSO/E&B/001 or latest. Inspection: Consignee, Inspection Charges: None Payment Terms:80% after supply & 20% after installation. B 576.00 Month 12403.63 7144490.88 AT Par 7144490.88 Description:- Upkeep of various components/Parts of IPS in which Comprehensive Annual Maintenance of SMPS based Integrated Power Supply System of M/s. STATCON ENERGIAA make confirming to RDSO spec No. RDSO/SPN/165/2012ver 3.0 or latest at stations in RE/non-RE area. it includes Routine preventive maintenance as well as rectification of all types of failures of the
maintenance, Checking, Testing, and replacement of the various modules including FRBC (SMR panel), DC-DC converters, inverters, transformers, CVT regulators, auto changeover panels, SPD of IPS sets and other components provided at various stations as per the technical conditions attached. the AMC would be completely comprehensive which means supply and installation of all the parts or components whether consumable or otherwise required to put right the system shall be supplied and installed by contractor at no extra cost for Two Years. 24 IPS for 24 months= 576 months.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
SNT-AII-46-2025-26Re-tenderAMCIPSstaenergia25.pdf
ATTACHMENT
Download all tender documents and submit your bid