Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.7 LAdmitted-Finance | -24.50% | ₹16.7 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified due to firm is registered in E4 category, so not fulfilling eligibility criteria as per Section -IV Pre-Qualification Requirement of RFP |
Tender Value
₹22.1 L
EMD Value
₹44,300
Closing Date
8 Jun 2026, 5:00 pmClosed
SE TW AVVNL AJMER
ROOM NO. 216 VIDHYUT BHAWAN PANCHSHEEL AVVNL AJMER
Construction of 33/11 KV GSS alongwith associated 33 and 11 KV lines under Khatukhurd Sub-Division of Deedwana-Kuchaman circle of Ajmer Discom on Labour Rate Basis
2026_AVVNL_559663_1
AJD/SE/TW/TN-465/Lot-1
Open Tender
Electrical Works
Percentage
135 days
SE TW AVVNL AJMER
as per specification
3 documents required · 3 mandatory
₹2,950
Sr. Accounts Officer (EA and Cash), AVVNL
₹44,300
29 Jun 2026
15 May 2026
9 Jun 2026
15 May 2026
8 Jun 2026
15 May 2026
15 May 2026 - 22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 33/11KV GSS | - | - | - | - |
| 2 | Levelling of ground | - | - | - | - |
| 3 | Levelling of ground up to 30 cm.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting) | 1,000 | Sq.Mtr | 1.67 | ₹1,670 |
| 4 | Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting) | 500 | Sq.Mtr | 7.47 | ₹3,735 |
| 5 | Trimming of tree branches/plants and preparing route approchases for proposed line. | 20 | Per tree/plant | 33.23 | ₹664.6 |
| 6 | Excavation of pit in ordinary rock which does not require blasting to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. | - | - | - | - |
| 7 | 9 Mtr/ 1.2mx0.6mx1.50 m deep | 48 | Pit | 283.4 | ₹13,603.2 |
| 8 | (C)Stay set/Depth of pit | - | - | - | - |
| 9 | 8'x 3/4" -0.75x0.5x1.6 m | 4 | Pit | 257.63 | ₹1,030.52 |
| 10 | 6'x 5/8" -0.75x0.5x1.35 m | 12 | Pit | 231.86 | ₹2,782.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
TechnicalSpecificationTN465.pdf
Tender Documents • 1.24 MB
BOQ_996306.xls
BOQ • 0.71 MB
datecorregendumtn465.pdf
PDF • 0.40 MB
Dateextension.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .