| 1.00Renovation of Anganwadi Building (RCC Roof) @ Kulathur in Kulathur Panchayat | |||||
| 1.01 | Roof Top of Pressed Tiles including cost and conveyance cost of al materials to work site and labour charges and finishing with one layer of pressed tiles of size 20 cm x 20 cm x 20mm embadded in cement morter 1:3 mix with water profing course and pointed with same mixed morter to full depth of tiles etc., complete. (30% New Tiles) | 33.45 | Sqm | 1,330 ₹44,488.50 | 1,328 ₹44,421.60 |
| 1.02 | Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification | 1.64 | Sqm | 285 ₹467.40 | 284 ₹465.76 |
| 1.03 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 21.42 | Sqm | 1,090 ₹23,347.80 | 1,084 ₹23,219.28 |
| 1.04 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum | 9.69 | Sqm | 160 ₹1,550.40 | 158 ₹1,531.02 |
| 1.05 | Pointing with cement mortar 1:3 mix to RR Masonry using cement including cost and conveyance of all materials to site and all labour charges etc complete | 11.72 | Sqm | 325 ₹3,809 | 322 ₹3,773.84 |
| 1.06 | Plastering with cement mortor 1:3 mix to 10mm thick in all floor including curing etc.complete complying with standard specification | 9.65 | Sqm | 330 ₹3,184.50 | 326 ₹3,145.90 |
| 1.07 | White washing two coats with shell lime including cost and conveyance of all labour charges ete, complete. | 31.11 | Sqm | 40 ₹1,244.40 | 39 ₹1,213.29 |
| 1.08 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 102.18 | Sqm | 155 ₹15,837.90 | 150.4 ₹15,367.87 |
| 1.09 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) SI No 358 | 94.76 | Sqm | 270 ₹25,585.20 | 267 ₹25,300.92 |
Updated dates
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer (BP)
Block Development Officer (BP) Panchayat Union, Kunnandarkoil
Renovation of Anganwadi Building (RCC Roof) at Kulathur in Kulathur Panchayat
2026_RDTN_654826_1
A2/302/2026
Open Tender
Civil Works
180 days
Kunnandarkoil
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,500
Yes
16 Apr 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
11 Feb 2026 - 17 Feb 2026
Renovation of Anganwadi Building (RCC Roof) @ Kulathur in Kulathur Panchayat
Roof Top of Pressed Tiles including cost and conveyance cost of al materials to work site and labour charges and finishing with one layer of pressed tiles of size 20 cm x 20 cm x 20mm embadded in cement morter 1:3 mix with water profing course and pointed with same mixed morter to full depth of tiles etc., complete. (30% New Tiles)
Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Pointing with cement mortar 1:3 mix to RR Masonry using cement including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortor 1:3 mix to 10mm thick in all floor including curing etc.complete complying with standard specification
White washing two coats with shell lime including cost and conveyance of all labour charges ete, complete.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) SI No 358
Painting two Coats with Approved Black Oxide for Old Black Board including all cost and all labour charges etc., complete
Provision for Bala Painting Work including all cost and all labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_785147.pdf
BOQ Comparative Chart
xlsx
finsummary_785147.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_785147.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid