Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
7 Dec 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC 2 MRT
SE EDC 2 MRT
T147/W/EDCII/2023-24
2023_PVVNL_861591_2
T147/W/EDCII/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
EDD2 MRT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC 2 MRT
₹2,000
13 Dec 2023
1 Dec 2023
7 Dec 2023
1 Dec 2023
7 Dec 2023
1 Dec 2023
Amount
Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :–
A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. (15 Qtl.)
Cartage of 10 KVA to 100 KVA Transformer from store centre to site of work including loading & unloading at both site
Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories .
Eartingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire.
Erection of PCC pole 8.5 mtr long/STP Pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of all 11 KV H.T/L.T. line accessories.
Erection of Double pole on PCC pole 8.5 mtr after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators and making connection properly.
Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly.
Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories.
Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.
Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting stringing of proper sagging of ACSR Rabbit conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting & sagging of LT line with A.B.C Bunch Conductor including proper binding & jumpring:- a) 3 phase 4 wire line.
Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting.
Cutting & chopping tree branches near side of line for making the clearance between line and tree (near about 100 branches).
Fixing of LT distribution box along with providing clamp Nut & Bolts
Providing and fixing stay clamps .
Providing and fixing F Clamp
Providing and fixing Holding Clamp
Providing and fixing LT clamps .
Providing and fixing LT Insulator clamps .
Providing and fixing Bolt and Nuts .
M/S ABID CONTRACTOR
Brij Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .