| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹9.0 L+₹67,440.40 (8.05%)Accepted-Finance | L2 | Accepted-Finance accepted | |
| 3 | L3₹10.9 L+₹2.6 L (30.6%)Accepted-Finance VILLAGE MANDRI P O CHALAHAL SUB TEHSIL DHAMI DISTT SHIMLA SHIMLA HIMACHAL PRADESH | L3 | Accepted-Finance Accepted |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
9 Mar 2023, 11:00 amClosed
DFO Kunihar
VPO Kunihar Tehsil Arki Distt.Solan HP 173207
Repair of Divisional Forest Office Building at Kunihar Tehsil Arki Distt. Solan HP
2023_FD_70051_1
6437 dated 02.03.2023
Open Tender
Civil Works
Item Rate
60 days
DFO Kunihar
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
DFO Kunihar
₹20,000
10 Mar 2023
2 Mar 2023
10 Mar 2023
2 Mar 2023
9 Mar 2023
2 Mar 2023
Amount
Demolition above ground level upto floor level two level of un -serviceable material with in a lead of 20mtr.
In Stair Poration .
Gallery poration.(Top of Roof.)
Jeep Poration Slab.
Truss Pillar.
Demolition of Brick Work above ground level upto floor level two level of un -serviceable material with in a lead of 20mtr.
For RCC Pillars.
Gallery poration.(Top of Roof.)
Providing Form work with Steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc., with wooden battens and ballies, length of propping and centring below supporing floor to ceiling not exceeding 4 mtrs. and removal of the same for in-situ- reinforced concrete and plain concrete work in:
Truss Pillar.
Truss Pillar.
Stair Poration.
Beams.
Landing.
Stair Slab.
Stair Side.
Stair Steps.
Tie Beams.
Long Wall.
Long Wall.
Short Walls.
Providing and laying cement concrete work 1:2:4 ( 1 cement: 2 sand : 4 graded stone aggregate 20 mm nominal size ) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:
Suspended floors, roofs, landings, Lintels, beams, girders, bressumers and cantilevers upto floor two level etc.
Truss Pillar.
Truss Pillar.
Stair Poration.
Beams.
Landing.
Stair Slab.
Stair Steps.
Tie Beams.
Long Wall.
Long Wall.
Short Walls.
Second class brick work using common burnt clay building bricks in superstructure upto floor two level in cement mortar 1:6 ( 1 cement : 6 sand)
Stair Steps.
Second class half brick masonry in common burnt clay building bricks in superstructure upto floor two level in cement mortar 1:4 ( 1 cement : 4 sand)
Stair Poration (Mounti)
Long Walls.
Short Walls.
Deductions.
P/F of M.S. Railing.
For Stair.
For Stair.
[email protected]/m3=1.45Qtl
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level:
Tor steel.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Total Roof Area.
Porch for Jeep.
Qty=293.06X@15kg/m2
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled withwhite lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
0.63 mm thick with zinc coating not less than 275 gm/ m²
Total Roof Area.
Porch for Jeep.
Repair of plaster in patches of 2.5 sqm & under &10 to 15mm thick i/c cutting the patch in proper shape replastering.
Pillars.
Distempering (two coats) with oil bound distemper.
Distempering (two coats) with oil bound distemper.
P/F PVC ceiling & skirting.
P/F PVC ceiling & skirting.
Eletricity fitting for ceiling poration etc.
hemraj
Manohar Singh
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .