Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹24,400
Closing Date
29 Sept 2026, 4:30 pm2d left
Public Works Department
PRAVIN R HULJI
Annual maintenance for the year 2026-27 is to be carried out on t km 2he following roads in Belagavi Taluk the connecting road to State Highway-31 (Bassapura-Aralikatti-Jatta-Jamboti route) from.065 to 3.00 the Bagewadi-Bassapura-Modaga road (connecting to RB Road) from km 9.00 to 11.41 and km 12.55 to 14.20 and the Halaga-Tarihala-Tigadi road from km 2.70 to 7.00
PWD/2026-27/RD/WORK_INDENT42523
PWD/2026-27/RD/WORK_INDENT42523
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
6 documents required · 6 mandatory
₹500
₹24,400
10 Sept 2026
10 Sept 2026
28 Sept 2026
Bassapur Aralikatti
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
White washing of parapet walls of CD work and tree trunks - White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technica...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and ...
Bagewadi Bassapur Modaga
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
White washing of parapet walls of CD work and tree trunks - White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technica...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and ...
Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Water Bound Macadam - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand ...
Halaga Taerihal Tigadi
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
White washing of parapet walls of CD work and tree trunks - White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technica...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and ...
Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Water Bound Macadam - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
42523 BID DOC GEN KW-1.doc
Tender Document • 1.61 MB
GOVT GOS AND TECHNICAL SPECIFN-KW-1-2.zip
Others - GOVT GOS AND TECHNICAL • 5.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .