Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹25,002.71 (11.2%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.6 L+₹36,127.38 (16.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.8 L
EMD Value
₹5,560
Closing Date
20 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
HALL NO. 4, 1ST BLOCK MINI SECTT., KISHTWAR
REFER BOQ
2026_RDPR_319332_6
e-NIT No 77 of REW KISHTWAR 2026-27 Dated. 01.08.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹5,560
Yes
3 Sept 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations etc. (not exceeding 1.5 min width) and for shafts,wells,cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil | 17.74 | cum | 479.3 | ₹8,502.78 |
| 2 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.47 | cum | 4,826.5 | ₹2,268.46 |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20% boulders | 0.27 | cum | 5,733.6 | ₹1,548.07 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.13 | sqm | 7,571.55 | ₹31,270.5 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | cum | 1,455.65 | - |
| 6 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:3 ( 1 cement : 3 coarse sand) | 3.72 | cum | 981.5 | ₹3,651.18 |
| 7 | Extra for half brick masonry in superstructure above plinth level upto floor five level | - | cum | 159.65 | - |
| 8 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 6.96 | cum | 592.9 | ₹4,126.58 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forLintel, beams, plinth beams, girders, bressumers and cantilevers. | 4.83 | sqm | 577.55 | ₹2,789.57 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand :3 graded stone aggregate 20 mm nominal size) | 0.55 | cum | 7,788.4 | ₹4,283.62 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1057245.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .