Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-Finance | ₹5.7 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹5.7 Cr+₹3,539.68 (<0.01%)Accepted-Finance | ₹5.7 Cr+₹3,539.68 (<0.01%) | L2 | Accepted-Finance Being L2 |
Tender Value
₹5.7 Cr
Closing Date
2 Jun 2021, 12:00 pmClosed
Chief Engineer, MOBEDS
3rd Floor Birla Building, Khurai Chingangbam Leikai, Imphal East
Construction of Drain at Imphal West, Manipur
2021_DMA_1368_1
MOBEDS-07/2021
Open Tender
Civil Works - Buildings
Item Rate
180 days
Imphal West, Manipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
Payable To
Exempted
9 Aug 2021
24 May 2021
2 Jun 2021
25 May 2021
2 Jun 2021
25 May 2021
Amount
Construction of Drain at Amudon Club to Machin (A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Amudon Club to Machin(B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Amudon Club to Machin ( C )
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mantri Lampak Amujao Mamang
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mantri Lampak Amujao Maning
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Khwai Ningthou Leirak (A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Khwai Ningthou Leirak(B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Khwai Ningthou Leirak ( C )
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Pukhrambam Leirak Santosh Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Pukhrambam Leirak Geet Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Nepra Menjor Devraj Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Salam Leikai Covid Party(A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Salam Leikai Covid Party (B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Salam Leikai Thingbaijam Mapa ( C )
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Cosntruction of Drain at Moirang Leirak Community Hall Chabungbam Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Chabungbam Somo Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mantri Lampak Premi
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mayai Koibi Club Mapa(A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mayai Koibi Club Mapa (B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Mayai Koibi Club Mapa ( C )
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Main Road Mamang
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Main Road Maning
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Popular School Mamang
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Nepra Menjor Killing Filed Mamang
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Kangabam Leikai (Gulson Party)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Kangabam Leikai Abai Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Salam Leikai Border Jeko
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Meino Leirak Kiran Mapa (A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Meino Leirak Kiran Mapa (B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Meino Leirak Naobi Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Kangabam Leikai Rojo Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Gojen Leirak
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Portion (A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Moirang Leirak Portion(B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Wahengbam Leikai Tiken Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction of Drain at Wahengbam Leikai Aryan Theatre Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain at Patsoi, Imphal West (Portion A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain at Patsoi, Imphal West (Portion B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Sayang Pukhri Lampak Maning
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Sayang (Akoijam Phantom Side)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Thangjam Leirak Manung(Nepra Mamang)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Thangjam Leirak Manung (Yumnam Road Side)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Nepra Menjor (Naorem Mamang)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Takhel Leikai Bubu Leirak.
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Keishamthong Kabui Khul Leirak.
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Mdu Leirak
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Amudon Dinesh Side
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Sayang Club Park Side
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Pukhrambam Leirak
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Leimakhujam Leikai Rk Boynao
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Bijoygovinda Main Road
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Kelli Makhong
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Meino Leirak Damu Mapa
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Amudon One Side (Tombi Road Side)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Bijoygovinda (Bonbihari Leirak)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Bijoygovinda (Rk Loken Leirak)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
Construction Of Drain At Mantri Leikai Sukhdeva Leirak
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:- a) Foundation footings, bases of column etc. and mass concrete
M/s L.B.C. Roy Agency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .