Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.8 L+₹32,999.76 (2.28%)Rejected-Finance | L2 | Rejected-Finance Quated high rate |
| Sl No | Description | Qty | Unit | SRI MURUGAN CONSTRUCTIONS L1 | DHANASEKAR K L2 |
|---|---|---|---|---|---|
| 1.00Name of work: Providing BT road at Sempoothampalayam Andavar nagar Streets H/O PERIYAPULIYUR | |||||
| 2.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 24.3 | cum | 601 ₹14,604.3 Lowest | 605 ₹14,701.5 |
| 3.00 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 513.42 | sqm | 23.3 ₹11,962.69 Lowest | 25 ₹12,835.5 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 193.4 | cum | 2,702.5 ₹5,22,663.5 Lowest | 2,705 ₹5,23,147 |
| 5.00 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,540.25 | sqm | 83.7 ₹1,28,918.93 Lowest | 85 ₹1,30,921.25 |
| 6.00 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,540.25 | sqm | 19.1 ₹29,418.78 Lowest | 25 ₹38,506.25 |
| 7.00 | Bituminous Macadam to 30mm thick (Grade-I) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 46.2 | cum | 11,177 ₹5,16,377.4 Lowest | 11,500 ₹5,31,300 |
| 8.00 | Provision for Name board charges | 1 | Nos | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,21,120.21 ₹2,21,120.21 Lowest | 2,26,154.07 ₹2,26,154.07 |
Tender Value
₹14.6 L
EMD Value
₹14,650
Closing Date
9 Dec 2025, 3:00 pmClosed
Block Development Officer (V.P), Bhavani
BDO
Providing BT road at Sempoothampalayam Andavar nagar Streets H/O PERIYAPULIYUR
2025_RDTN_627684_1
4883/2025/A4
Open Tender
Civil Works - Others
Item Rate
105 days
Block Development Officer (V.P), Bhavani
Providing BT road at Sempoothampalayam Andavar nagar Streets H/O PERIYAPULIYUR
6 documents required · 6 mandatory
₹0
₹14,650
Yes
23 Jan 2026
29 Nov 2025
9 Dec 2025
29 Nov 2025
9 Dec 2025
29 Nov 2025
Amount
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Bituminous Macadam to 30mm thick (Grade-I) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
DHANASEKAR K (BID ID -1526965)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_750425.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice1464000.pdf
Tender Documents • 0.28 MB
BOQ_750425.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .