| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-AOC | ₹18.0 L | 1 | Accepted-AOC lowest |
| 2 | 2₹19.2 LRejected-Finance SANGRUR | SANGRUR | PUNJAB | 148001 | ₹19.2 L | 2 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | S.S. ENGINEERS AND CONTRACTORS L2 | J.S. CONTRACTOR SANGRUR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | 1 | Cum | 104.09 ₹104.09 | 100.34 ₹100.34 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | 1 | Cum | 112.22 ₹112.22 | 108.19 ₹108.19 |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 212.82 ₹212.82 | 205.17 ₹205.17 |
| 4.00 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | 1 | Cum | 6,813.57 ₹6,813.57 | 6,568.62 ₹6,568.62 |
| 5.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 193.47 ₹193.47 | 186.51 ₹186.51 |
| 6.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 150.49 ₹150.49 | 145.08 ₹145.08 |
| 7.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR
Item No 10.13 (a) (i) | 1 | Cum | 11,181.02 ₹11,181.02 | 10,779.07 ₹10,779.07 |
| 8.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,151.84 ₹6,151.84 | 5,930.69 ₹5,930.69 |
| 9.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 4,629.86 ₹4,629.86 | 4,463.42 ₹4,463.42 |
| 10.00 | Lowering, jointing and cutting of RCC pipes 450 mm dia into trenches & laying same to correct alignment complete | 1 | Metre | 267.55 ₹267.55 | 257.93 ₹257.93 |
Updated dates
Tender Value
₹23 L
EMD Value
₹46,000
Closing Date
19 Mar 2026, 9:00 amClosed
DivisionalEngineer SangurBarnalaPWRMDC Divi
DivisionalEngineer SangurBarnalaPWRMDC Division Barnala
Estimate for ReLining Lining of WC by Laying Underground Pipeline of OL RD 14140L of Dhanoula Disty Village Dhanoula Distt.Barnala Laying and Jointing of RCC UGPL system and other allied works in construction of watercourse
2026_WR_159398_10
NIT03/2026
Open Tender
Civil Works
180 days
Barnala
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹46,000
DivisionalEngineer SangurBarnalaPWRMDC Divi
6 May 2026
5 Feb 2026
19 Mar 2026
5 Feb 2026
19 Mar 2026
5 Feb 2026
10 Feb 2026
For works upto 10 lacs
Project in-charge
Work Manager/Site Engineer
Engineering Graduate
Skilled employees
UnSkilled employees
Signature of the bidder with date
PUNJAB WATER RESOURCE MANAGEMENT & DEVELOPMENT CORPORATION
Schedule C
(Details of Machinery/Equipment/required/avaiable with the bidder and likely to be deployed for the work)
Name of Constructor/Agency/L & C Society
Name of the Work
Proclain/Front End Loader/J.C.B.
Truck/Tipper/Dumper
Concrete Mixer
Paver
Change as per requirement of Work
List of equipment/machinery may vary as per work requirement
* Information to be filled in by the Executive Engineer in-charge.
Signature of the bidder with date
PUNJAB WATER RESOURCE MANAGEMENT & DEVELOPMENT CORPORATION
Schedule D
Name of the Contractor / L&C Society
Name of the Work
Please fill information about the each relevant work completed during the last Five years for works Costing more than Rs.5 Lac
Name of Employer
Signature of the bidder with date
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr.
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)].
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR Item No 10.13 (a) (i)
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing and cutting of RCC pipes 450 mm dia into trenches & laying same to correct alignment complete
Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4)
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 )
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-450 mm
Centreing & shuttering for Concerte faces
Providing and fixing of Steel Shutter Gates Assembly in Main Pipeline complete in all respects.
Dismantling of Brick work in Cement, CSR 2020 - item no- 8.5 (b)
NOTE:- Credit of old materials as per sanctioned estimate will be recovered from the bidder and it will be taken into the acccount while preparing the comparative statement of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.05 MB
PKG10RD14140L.xls
Tender Documents • 0.04 MB
BOQ_323238.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid