Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-Finance | ₹11.9 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹12.0 L+₹7,268.46 (0.61%)Accepted-Finance | ₹12.0 L+₹7,268.46 (0.61%) | L2 | Accepted-Finance Second lowest bidder |
| 3 | L3₹12.5 L+₹56,330.57 (4.73%)Accepted-Finance | ₹12.5 L+₹56,330.57 (4.73%) | L3 | Accepted-Finance Third lowest bidder |
Tender Value
₹13.0 L
EMD Value
₹25,959
Closing Date
15 Jul 2026, 4:00 pmClosed
Officer Commanding
Construction Sqn. NSG Manesar, Gurgaon
ARM of Communication Group Buildings at NSG Camp Manesar for the year 2026-27 (SH Civil and Electrical Maintenance)
2026_NSG_916531_1
18/CS/2026-27/NSG
Open Tender
Civil Works - Others
Percentage
180 days
NSG Campus Manesar
ARM of Communication Group Buildings at NSG Camp Manesar for the year 2026-27 (SH Civil and Electrical Maintenance)
3 documents required · 3 mandatory
₹0
₹25,959
24 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
8 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 1.01 | Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 1 | Cum | 1,503.6 | ₹1,503.6 |
| 2Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : | |||||
| 2.01 | Of area 3 sq. metres and below | 10 | each | 367.2 | ₹3,672 |
| 3Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: | |||||
| 3.01 | Channels, angles, tees and flats | 50 | KG | 2.3 | ₹115 |
| 4Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | |||||
| 4.01 | For thickness of tiles 10 mm to 25 mm | 15 | SQM | 73.4 | ₹1,101 |
| 5 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | 35 | sqm | 266.45 | ₹9,325.75 |
| 6Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_963202.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .