Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-Finance | ₹10.7 L | L1 | Accepted-Finance Qualified |
| 2 | L2₹10.9 L+₹21,510 (2.01%)Accepted-Finance | ₹10.9 L+₹21,510 (2.01%) | L2 | Accepted-Finance Qualified |
| 3 | L3₹11.2 L+₹46,750 (4.37%)Accepted-Finance | ₹11.2 L+₹46,750 (4.37%) | L3 | Accepted-Finance Qualified |
| 4 | L4₹12.9 L+₹2.2 L (20.1%)Accepted-Finance | ₹12.9 L+₹2.2 L (20.1%) | L4 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | M/S HILAL ENTERPRISES L4 | Kay and Q Infrastructures Private Limited L3 | FAYAZ AHMAD DAR L2 | mohd yousuf wani L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply ,Installation, testing and commissioning of 63 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | 1,65,000 ₹1,65,000 | 1,70,000 ₹1,70,000 | 1,42,400 ₹1,42,400 Lowest | 1,80,000 ₹1,80,000 |
| 2.00 | Supply ,Installation, testing and commissioning of ST poles 9 m long ST-410 SP -33 with base plate & cap weight 164kg | 30 | No | 19,999 ₹5,99,970 | 17,500 ₹5,25,000 | 17,850 ₹5,35,500 | 16,000 ₹4,80,000 Lowest |
| 3.00 | Supply and fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 27 | No | 250 ₹6,750 Lowest | 450 ₹12,150 | 650 ₹17,550 | 400 ₹10,800 |
| 4.00 | Supply ,Installation, testing and commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | 2,450 ₹2,450 Lowest | 4,900 ₹4,900 | 2,500 ₹2,500 | 4,500 ₹4,500 |
| 5.00 | Supply ,Installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 12,500 ₹12,500 | 11,000 ₹11,000 | 9,500 ₹9,500 | 9,000 ₹9,000 Lowest |
| 6.00 | Supply ,Installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,590 ₹4,590 | 4,900 ₹4,900 | 3,500 ₹3,500 Lowest | 4,500 ₹4,500 |
| 7.00 | Supply, laying and fixing of 70mm² (1CKt)Single-Core Cable, 2 Ckt 1.1k V Grade, XLPE un armoured FRLS type | 44 | Mtr | 210 ₹9,240 | 120 ₹5,280 Lowest | 195 ₹8,580 | 200 ₹8,800 |
| 8.00 | Providing and fixing of GI Channel/Angle/Flat /Clamps and braces including V Cross ,F-Top ,Black Clamps | 940 | Kgs | 145 ₹1,36,300 | 125 ₹1,17,500 | 119 ₹1,11,860 Lowest | 125 ₹1,17,500 |
| 9.00 | Providing and fixing of Galvinized Nuts and Bolts. | 36 | Kgs | 135 ₹4,860 | 125 ₹4,500 Lowest | 125 ₹4,500 Lowest | 130 ₹4,680 |
| 10.00 | Providing and fixing Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm | 31 | No | 1,099 ₹34,069 | 600 ₹18,600 Lowest | 750 ₹23,250 | 750 ₹23,250 |
Tender Value
₹13 L
EMD Value
₹26,000
Closing Date
5 Aug 2026, 11:00 amClosed
Executive Engineer
ED Awantipora
Creation of 63 KVA Ht Electrical Transformer Sub Station including MS Tublar poles for a lead of 850 M approx. 32 poles ACSR 0.5 Conductor and extension of HT feeder at Baribal Wandakpora Pulwama
2026_PDD_316177_1
EDA 24 of 2026-27 Dated 15-07-26
Open Tender
Electrical Works
Turn-key
35 days
Awantipora
Please refer to SBD
3 documents required · 3 mandatory
₹1,000
Yes
Executive Engineer ED Awantipora
₹26,000
Yes
22 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
5 Aug 2026
16 Jul 2026
16 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply ,Installation, testing and commissioning of 63 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | - | - |
| 2 | Supply ,Installation, testing and commissioning of ST poles 9 m long ST-410 SP -33 with base plate & cap weight 164kg | 30 | No | - | - |
| 3 | Supply and fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 27 | No | - | - |
| 4 | Supply ,Installation, testing and commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | - | - |
| 5 | Supply ,Installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | - | - |
| 6 | Supply ,Installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | - | - |
| 7 | Supply, laying and fixing of 70mm² (1CKt)Single-Core Cable, 2 Ckt 1.1k V Grade, XLPE un armoured FRLS type | 44 | Mtr | - | - |
| 8 | Providing and fixing of GI Channel/Angle/Flat /Clamps and braces including V Cross ,F-Top ,Black Clamps | 940 | Kgs | - | - |
| 9 | Providing and fixing of Galvinized Nuts and Bolts. | 36 | Kgs | - | - |
| 10 | Providing and fixing Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm | 31 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.86 MB
BOQ_1029823.xls
BOQ • 0.26 MB
NIT24.pdf
Tender Documents • 2.07 MB
SBD24.pdf
Other Document • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .