Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.6 LAdmitted-Finance | ₹37.6 L | L1 | Admitted-Finance |
| 2 | L2₹45.9 L+₹8.3 L (22.1%)Admitted-Finance | ₹45.9 L+₹8.3 L (22.1%) | L2 | Admitted-Finance |
| 3 | L3₹47.4 L+₹9.9 L (26.2%)Admitted-Finance R O Y K PURA QAZIGUND ANANTNAG 192221 J K | ANANTNAG | JAMMU AND KASHMIR | 192221 | ₹47.4 L+₹9.9 L (26.2%) | L3 | Admitted-Finance |
| 4 | L4₹48.4 L+₹10.8 L (28.8%)Admitted-Finance | ₹48.4 L+₹10.8 L (28.8%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N K BUILDERS L2 | M/S BHAT ENGINEERS L3 | KOHINOOR METAL INDUSTRIES L1 | SHUBHAM ENGINEERS & BUILDERS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of plain or corrugated steel sheeting,any gauge, thickness, including Nanital or similar pattern roof coverings complete all as specified and directed by Engr-in-charge. | 573.15 | Sqm | 30 ₹17,194.5 | 9 ₹5,158.35 Lowest | 28.2 ₹16,162.83 | 20 ₹11,463 |
| 2.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 12.07 | Qtl | 600 ₹7,242 | 200 ₹2,414 | 57.9 ₹698.85 Lowest | 550 ₹6,638.5 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed by by Engr-in-charge. | 454.51 | Sqm | 25 ₹11,362.75 | 12 ₹5,454.12 Lowest | 89.5 ₹40,678.65 | 25 ₹11,362.75 |
| 4.00 | Demolition of Cement Concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed by by Engr-in-charge. | 3.28 | Cum | 1,200 ₹3,935.25 | 300 ₹983.81 Lowest | 1,631.3 ₹5,349.64 | 700 ₹2,295.56 |
| 5.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, for ashlar facings, dressed stonework and precast concrete articles and precast concrete block walling complete all as specified and as directed by by Engr-in-charge. | 4 | Cum | 1,200 ₹4,800 | 300 ₹1,200 Lowest | 1,746.84 ₹6,987.36 | 800 ₹3,200 |
| 6.00 | Taking down Chowkhats or frames not exc. 1.5 sq. m each with shutters (without taking off shutters from the frames) complete all as specified and directed by Engr-in-Charge. | 25 | Each | 250 ₹6,250 | 98 ₹2,450 Lowest | 282.9 ₹7,072.5 | 150 ₹3,750 |
| 7.00 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frames) complete all as specified and directed by Engr-in-Charge. | 12 | Each | 350 ₹4,200 | 98 ₹1,176 Lowest | 357.3 ₹4,287.6 | 250 ₹3,000 |
| 8.00 | Dismantling of wall and ceiling boards(fiber,pulp,insulation,etc.) or insulation boards/slabs/blankets,any thickness,including cover fillets | 524.81 | Sqm | 10 ₹5,248.1 Lowest | 12 ₹6,297.72 | 41.6 ₹21,832.1 | 15 ₹7,872.15 |
| 9.00 | Taking down cement plaster on brick or stone walls, etc, incl raking out joints, hacking for key, scrubbing down with water, etc & prepare to receive new plaster complete all as specified and directed | 434.21 | Sqm | 50 ₹21,710.63 | 11 ₹4,776.34 Lowest | 94.94 ₹41,224.13 | 20 ₹8,684.25 |
| 10.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 0.84 | Cum | 1,300 ₹1,092 | 300 ₹252 Lowest | 1,883.7 ₹1,582.31 | 1,100 ₹924 |
Tender Value
₹44.2 L
EMD Value
₹88,400
Closing Date
8 Aug 2026, 6:00 pmClosed
GE AF LEH
GE AF LEH, NEAR POLICE HEAD QUARTER, LEH PIN 194101
ADDN ALTN TO CERTAIN AIRMEN BILLETS AT 21 WG UNDER GE AF LEH
2026_MES_770207_2
GE(AF)Leh/T-32/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE AF LEH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF LEH
₹88,400
Yes
20 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
8 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of plain or corrugated steel sheeting,any gauge, thickness, including Nanital or similar pattern roof coverings complete all as specified and directed by Engr-in-charge. | 573.15 | Sqm | - | - |
| 2 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 12.07 | Qtl | - | - |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed by by Engr-in-charge. | 454.51 | Sqm | - | - |
| 4 | Demolition of Cement Concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed by by Engr-in-charge. | 3.28 | Cum | - | - |
| 5 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, for ashlar facings, dressed stonework and precast concrete articles and precast concrete block walling complete all as specified and as directed by by Engr-in-charge. | 4 | Cum | - | - |
| 6 | Taking down Chowkhats or frames not exc. 1.5 sq. m each with shutters (without taking off shutters from the frames) complete all as specified and directed by Engr-in-Charge. | 25 | Each | - | - |
| 7 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frames) complete all as specified and directed by Engr-in-Charge. | 12 | Each | - | - |
| 8 | Dismantling of wall and ceiling boards(fiber,pulp,insulation,etc.) or insulation boards/slabs/blankets,any thickness,including cover fillets | 524.81 | Sqm | - | - |
| 9 | Taking down cement plaster on brick or stone walls, etc, incl raking out joints, hacking for key, scrubbing down with water, etc & prepare to receive new plaster complete all as specified and directed | 434.21 | Sqm | - | - |
| 10 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 0.84 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
tender32.pdf
Tender Documents • 1.21 MB
BOQ_872746.xls
BOQ • 3.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .