| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹84.1 L+₹1.0 L (1.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹98.0 L+₹15.0 L (18.0%)Admitted-Finance NULL | L3 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
5 Oct 2026, 5:00 pmClosed
VIMAL DEEP
DIV 1 Gurugram
Construction of 24 Mtr wide Road and SWD Line in Front of Commercial Site C-2 and C-4, Sector-62, Gurugram.
2026_HBC_550001_1
2026FC6B828E 7563 43DF B5E1 BAEADA1DA225252HSV
Open Tender
Civil Works
Works
180 days
Gurugram
2 documents required · 2 mandatory
₹3,000
₹2.2 L
Yes
16 Oct 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] | 1,925 | Sqm | 637 | ₹12,26,225 |
| 2 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) [Through Rate] | 154.26 | Sqm | 147 | ₹22,676.22 |
| 3 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 196.74 | Sqm | 138 | ₹27,150.12 |
| 4 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] | 100.63 | cum | 1,094 | ₹1,10,089.22 |
| 5 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] | 1,015 | cum | 1,174 | ₹11,91,610 |
| 6 | [17.26.1]Tack Coat 1. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] | 9,800 | Sqm | 13 | ₹1,27,400 |
| 7 | [17.30.1]Dense Graded Bituminous Macadam with Batch Type HMP 1. Dense Graded Bituminous Macadam 80 mm to 100 mm thickness (Grading I)
Providing and laying 80mm -100 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.0% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications [Through Rate] | 245 | cum | 6,133 | ₹15,02,585 |
| 8 | [17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 147 | cum | 7,749 | ₹11,39,103 |
| 9 | [17.36.1]Seal Coat 1. Seal Coat Type A with VG -10
Providing and laying seal coat Type A (liquid Seal Coat) sealing the voids in a bituminous surface using crushed stone aggregates and penetration grade bitumen VG- 10 @ 0.98 kg/sqm laid to the specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications. [Through Rate] | 4,900 | Sqm | 55 | ₹2,69,500 |
| 10 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | 8,391.25 | cum | 184 | ₹15,43,990 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_629767.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .