Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -32.00% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 L+₹41,842.32 (7.35%)Admitted-Finance | -27.00% | ₹6.1 L+₹41,842.32 (7.35%) | L2 | Admitted-Finance |
| 3 | L3₹6.3 L+₹57,742.40 (10.1%)Admitted-Finance | -25.10% | ₹6.3 L+₹57,742.40 (10.1%) | L3 | Admitted-Finance |
| 4 | L4₹6.3 L+₹58,579.25 (10.3%)Admitted-Finance | -25.00% | ₹6.3 L+₹58,579.25 (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹6.5 L+₹83,684.64 (14.7%)Admitted-Finance | -22.00% | ₹6.5 L+₹83,684.64 (14.7%) | L5 | Admitted-Finance |
Tender Value
₹8.4 L
EMD Value
₹8,368
Closing Date
23 Feb 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAC PURUSHOTTAMPUR
Office of the Executive Officer, Purushottampur NAC
Construction of CC Road from PWD Road near ICICI Bank to Harihara Nagar at Ward No. 8, 12, NAC Purushottampur
2026_ORULB_125841_2
PPUR-NAC-04/2025-26
Open Tender
Civil Works - Others
Percentage
PURUSHOTTAMPUR NAC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Officer, Purushottampur NAC
₹8,368
Yes
27 Feb 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods to maximum 5cm to 7cm & laying in layers not exceeding .0.3m depth and as per direction of the Engineer-in-Charge | 66.67 | Cum. | 299.53 | ₹19,969.67 |
| 2 | Providing, supplying, filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty, taxes of all materials with all labour, T&P etc., complete. | 29.74 | Cum. | 1,190.58 | ₹35,407.85 |
| 3 | Cement concrete of proportion (1:3:6) in F&F using 40mm size bhg metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect . | 11.03 | Cum. | 5,771.52 | ₹63,659.87 |
| 4 | Cement concrete of proportion (1:1 1/2:3) in F&F using 12mm size cb/hb chips of approved quality for R.C.C. works including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. | 33.59 | Cum. | 8,512.48 | ₹2,85,934.2 |
| 5 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | 347.9 | qntl. | 248.67 | ₹86,512.29 |
| 6 | Reinforced Cement concrete work of M-20 grade with 20mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & laying including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. | 32.34 | Sqm. | 6,127.29 | ₹1,98,156.56 |
| 7 | Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyance, taxes of steel and all other materials, cost of all labour with T&P required for the work etc. complete. | 15.52 | L.S. | 9,356.05 | ₹1,45,205.9 |
| 8 | Add cost of display board and photographs Pre, during & post) | 1 | L.S. | 2,000 | ₹2,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.38 MB
DTCNKALIMANDIRHARIHARANAGAR.pdf
Tender Documents • 7.36 MB
BOQ_580652.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .