Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.2 L+₹21,607.65 (3.11%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.4 L+₹40,879.33 (5.88%)Admitted-Finance R O BILLAWAR TEHSIL BILLAWAR DISTRICT KATHUA | L3 | Admitted-Finance | ||
| 4 | L4₹7.5 L+₹50,923.97 (7.33%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹7.9 L+₹97,526.40 (14.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹23,340
Closing Date
30 Jul 2026, 4:00 pmClosed
XEN REW KATHUA
XEN REW KATHUA
Constt. of Lane and Drain at Mahajan Moh, W. No. 03, Pyt. Dher, Block Billawar
2026_RDPR_316744_1
e-NIT No.126/REW/K of 2026-27 Dated 18/07/2026
Open Tender
Civil Works
Percentage
90 days
Duggain
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹23,340
4 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 20.44 | sqm | 24.12 | ₹493.01 |
| 2 | Earth work in excavation by manual means in trenches for foundation drains pipes cables etc (not exceeding 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 0.83 | cum | 479.3 | ₹397.82 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1:5:10) | 1.59 | cum | 4,826.5 | ₹7,674.14 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using 20% boulders | 35.23 | cum | 4,774.46 | ₹1,68,204.23 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 37.33 | sqm | 5,733.6 | ₹2,14,035.29 |
| 6 | Providing and laying 80mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 759 | sqm | 929.85 | ₹7,05,756.15 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundation | 57.8 | sqm | 286.35 | ₹16,551.03 |
| 8 | Carriage of Sand and bajree avg lead of 6.0 km by MT | 90.56 | cum | 213.58 | ₹19,341.8 |
| 9 | Carriage Stone an average lead 2.0km by Mt | 7.04 | no. | 170.93 | ₹1,203.35 |
| 10 | Carriage of tiles avg.lead 6.0km | 26,802 | no. | 0.34 | ₹9,159.05 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.90 MB
BOQ_1034680.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .