Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹34.5 L (33.0%)Admitted-Finance | ₹1.4 Cr+₹34.5 L (33.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BORDIA AND ASSOCIATES L1 | Sanjay Tak L2 |
|---|---|---|---|---|---|
| 1.00 | Contraction of sand stone Mehrab in existing opening at site made up of Bansi Paharpur stone having carving etc. as per existing mehrab at site.(payment shell be made for the total area from bottom line of meharab to apex line) 75 mm thick Both Side carving as per direction of engineer incharge | 4.5 | Sqm | 36,000 ₹1,62,000 | 19,000 ₹85,500 Lowest |
| 2.00 | Providing and fixing of Bansipaharpur sand stone chowkhat 40 mm thick in the existing opening as per approved drawing and design and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 24.17 | Sqm | 8,600 ₹2,07,862 Lowest | 9,000 ₹2,17,530 |
| 3.00 | Providing and fixing of Bansipaharpur sand stone chowkhat 25 mm thick in the existing opening as per approved drawing and design. and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 2.9 | Sqm | 6,300 ₹18,270 Lowest | 7,300 ₹21,170 |
| 4.00 | Providing and fixing of Bansi paharpur pink sand stone Kangoora 50mm Thick as of approved design and drawing by Engineer In Charge.Approximate 450mm Height and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 37.03 | Rm | 9,600 ₹3,55,488 | 7,300 ₹2,70,319 Lowest |
| 5.00 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of bars.20 mm bar | 32 | Nos. | 700 ₹22,400 Lowest | 1,950 ₹62,400 |
| 6.00 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of hilty bars.25 mm bar | 28 | Nos. | 900 ₹25,200 Lowest | 2,150 ₹60,200 |
| 7.00 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of hilty bars.16 mm Hilty bar | 16 | Nos. | 650 ₹10,400 Lowest | 1,400 ₹22,400 |
| 8.00 | Providing, supplying and installing heavy-duty modular raised access flooring system of 150–200 mm finished floor height, comprising 600 × 600 mm removable high-density cementitious raised-floor panels, minimum 30 mm thick, with factory-applied minimum 2 mm thick homogeneous conductive/anti-static PVC/vinyl tile finish, supported on adjustable galvanized steel pedestal and stringer framing system. The framing shall comprise galvanized steel base plates, adjustable threaded pedestals with locking nuts and heads, and galvanized steel box/channel stringers forming a rigid 600 × 600 mm grid, securely anchored to the RCC slab and accurately levelled. The item shall include conductive anti-vibration gaskets, GI perimeter angle/channel supports, edge trims, additional supports at heavy equipment and service openings, approved anchor fasteners, brackets, bolts and all necessary accessories. Panels shall be individually removable for access to underfloor electrical, data, CCTV and MEP services. All required cut-outs, access panels, reinforcement, grommets and edge protection around cable trays, conduits, floor boxes and equipment shall be provided. Complete metallic framing shall be electrically bonded to the building earthing system for ESD protection. The flooring system shall be designed for minimum 12 kN/m² uniformly distributed load and 4.5 kN concentrated load, or actual equipment loading, whichever is higher. Rate shall include complete supply, transportation, fabrication, fixing, anchoring, levelling, alignment, cutting, fitting, reinforcement, earthing/bonding, testing, cleaning, labour, wastage and all necessary materials and accessories, complete in all respects as per approved shop drawings, manufacturer's recommendations and Engineer-in-Charge's instructions.Note- The Work should be executed by Professionals specifically do false flooring work by the contractor and Rates should be quoted accordingly. | 300 | Sqm | 6,900 ₹20,70,000 Lowest | 8,850 ₹26,55,000 |
Tender Value
₹97.7 L
EMD Value
₹2.0 L
Closing Date
2 Sept 2026, 5:00 pmClosed
Cheif Executive Officer
Nathdwara Temple Board Nathdwara
Construction of Command Control Centre at Terrace Floor Phase-II Building Shreenathji Temple Premises Nathdwara Temple Board, Nathdwara
2026_NATB_592966_1
4926/NV/2026 DT 26/08/2026
Open Tender
Civil Works
Percentage
60 days
Nathdwara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
NATHDWARA TEMPLE BOARD/MDRISL JAIPUR
₹2.0 L
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Contraction of sand stone Mehrab in existing opening at site made up of Bansi Paharpur stone having carving etc. as per existing mehrab at site.(payment shell be made for the total area from bottom line of meharab to apex line) 75 mm thick Both Side carving as per direction of engineer incharge | 4.5 | Sqm | 100 | ₹450 |
| 2 | Providing and fixing of Bansipaharpur sand stone chowkhat 40 mm thick in the existing opening as per approved drawing and design and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 24.17 | Sqm | 100 | ₹2,417 |
| 3 | Providing and fixing of Bansipaharpur sand stone chowkhat 25 mm thick in the existing opening as per approved drawing and design. and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 2.9 | Sqm | 10 | ₹29 |
| 4 | Providing and fixing of Bansi paharpur pink sand stone Kangoora 50mm Thick as of approved design and drawing by Engineer In Charge.Approximate 450mm Height and backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) or stone adhesive including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid separately) | 37.03 | Rm | 10 | ₹370.3 |
| 5 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of bars.20 mm bar | 32 | Nos. | 10 | ₹320 |
| 6 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of hilty bars.25 mm bar | 28 | Nos. | 100 | ₹2,800 |
| 7 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality hilty filler as per structural drawing to provide a tensil strength as per requirement and fix the Bar to the saction including cost of hilty bars.16 mm Hilty bar | 16 | Nos. | 100 | ₹1,600 |
| 8 | Providing, supplying and installing heavy-duty modular raised access flooring system of 150–200 mm finished floor height, comprising 600 × 600 mm removable high-density cementitious raised-floor panels, minimum 30 mm thick, with factory-applied minimum 2 mm thick homogeneous conductive/anti-static PVC/vinyl tile finish, supported on adjustable galvanized steel pedestal and stringer framing system. The framing shall comprise galvanized steel base plates, adjustable threaded pedestals with locking nuts and heads, and galvanized steel box/channel stringers forming a rigid 600 × 600 mm grid, securely anchored to the RCC slab and accurately levelled. The item shall include conductive anti-vibration gaskets, GI perimeter angle/channel supports, edge trims, additional supports at heavy equipment and service openings, approved anchor fasteners, brackets, bolts and all necessary accessories. Panels shall be individually removable for access to underfloor electrical, data, CCTV and MEP services. All required cut-outs, access panels, reinforcement, grommets and edge protection around cable trays, conduits, floor boxes and equipment shall be provided. Complete metallic framing shall be electrically bonded to the building earthing system for ESD protection. The flooring system shall be designed for minimum 12 kN/m² uniformly distributed load and 4.5 kN concentrated load, or actual equipment loading, whichever is higher. Rate shall include complete supply, transportation, fabrication, fixing, anchoring, levelling, alignment, cutting, fitting, reinforcement, earthing/bonding, testing, cleaning, labour, wastage and all necessary materials and accessories, complete in all respects as per approved shop drawings, manufacturer's recommendations and Engineer-in-Charge's instructions.Note- The Work should be executed by Professionals specifically do false flooring work by the contractor and Rates should be quoted accordingly. | 300 | Sqm | 10 | ₹3,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_1052545.xls
BOQ • 0.45 MB
AgreementTermsandConditions.pdf
Tender Documents • 6.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .