| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC DANGRA TOLI CHOWK PURULIA ROAD RANCHI | RANCHI | ₹16.3 L Quoted ₹16.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.0 LRejected-AOC | ₹17.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Blaca Corporations L1 | CHANDRA BROTHERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and installation of horizontal split casing centrifugal pump having discharge of 14300 G.P.H clear water against a total head of 40 meters (131.2 feet) Make- Kirloskar/Mather and Platt/ jyoti / Wilo with a suitable squirrel cage induction motor 3 ph, 415 V ± 10% ,1480 r.p.m, Make- Kirloskar/ jyoti/ crompton /ABB coupled by means of tyre coupling on a common base plate with N.R valve, sluice valve rating PN- 1, ISI marked , foot valve, pressure gauge etc. all complete. | 2 | SET | 6,68,000 ₹13,36,000 | 6,80,000 ₹13,60,000 |
| 2.00 | Cost towards supply and fitting 25 H.P fully automatic air break star delta starter , Make- L&T /Havell’s/ Siemens / Schneider / BCH | 2 | EACH | 14,000 ₹28,000 | 14,000 ₹28,000 |
| 3.00 | Cost towards replacement of damaged parts of panel by new supply and fitting 100 amp T.P.N DTH MCCB-1no incoming feeder and 63 amp T.P.N DTH MCCB-3 nos. outgoing ,0 to500v voltmeter - 2 nos., 0to 100 amp ammeter-2 nos. with selector switch ,indicating lamp 3 Nos., making internal connection with copper wire etc. | 1 | EACH | 82,700 ₹82,700 | 83,500 ₹83,500 |
| 4.00 | Cost towards dismantling 2 no. 10 H.P C/F pump set with all accessories such as suction and delivery pipe line ,foot valve ,sluice & N.R valve, base plate etc ,including demolish old foundation -2 nos. for installation of new pump set, including keeping pump set in store or as per direction of E/I and throwing broken foundation outside the pump house including cost of labors , tools, tackles. | 2 | JOB | 11,000 ₹22,000 | 11,500 ₹23,000 |
| 5.00 | Cost towards making new P.C.C foundation with supplying stone chips, sand, cement, in the ratio 3:2:1 respectively about 5’x4’x3’for above pump sets including foundation bolts with nut and washer and curing plastering of foundation ,all complete . | 2 | JOB | 22,000 ₹44,000 | 22,000 ₹44,000 |
| 6.00 | Supplying and laying of 35 mm sq. 1.1 K.V grade,3.5 core P.V.C insulated and sheathed armored Al. cable , make – polycab, havell’s /,KEI, ISI marked, | 20 | METRE | 440 ₹8,800 | 450 ₹9,000 |
| 7.00 | Cost towards doing cable socketing with Al lugs 35 mm sq. Al. cable | 2 | ENDS | 185 ₹370 | 190 ₹380 |
| 8.00 | Cost of supply & laying, commissioning of 3 core 16 mm² copper conductor cable 1.1 KV grade PVC insulated and PVC sheathed unarmored from panel to starter and starter to motor with lugs socketing, | 60 | METRE | 910 ₹54,600 | 930 ₹55,800 |
| 9.00 | Cost towards making chemical earthing as per I:E Rules ,etc. all complete. | 2 | JOB | 17,000 ₹34,000 | 17,300 ₹34,600 |
| 10.00 | Cost towards making suction & delivery pipe line with supply of 100 m.m dia. heavy duty M.S pipe 40 feet , 100 m.m dia. M.S flange- 6 nos. , 100 m.m dia. heavy duty M.S bend -2 nos., 75 m.m dia. heavy duty M.S pipe -10 ft., 75 m.m dia. heavy duty M.S flange -6 nos. 75 m.m dia. heavy duty M.S bend -2 nos including cutting welding , required nut bolts, washer, rubber insertion, testing on load , all complete . | 1 | JOB | 34,000 ₹34,000 | 35,000 ₹35,000 |
Tender Value
₹16.4 L
EMD Value
₹33,000
Closing Date
22 Apr 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
D W AND S MECH DIVISION HAZARIBAG
Supplying installation commissioning and testing of HSC Centrifugal pump set and associated works at Gumo boosting water supply pumping plant Reorganization for urban water supply Gumo area Jhumari tilaiya
2026_DWSD_112849_1
DWSD/HZB/MECH/TILAIYA/SUPPLY-2 Group A
Open Tender
Pumps/Motors
90 days
JHUMRI TELAIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹33,000
Yes
27 Jun 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
22 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and installation of horizontal split casing centrifugal pump having discharge of 14300 G.P.H clear water against a total head of 40 meters (131.2 feet) Make- Kirloskar/Mather and Platt/ jyoti / Wilo with a suitable squirrel cage induction motor 3 ph, 415 V ± 10% ,1480 r.p.m, Make- Kirloskar/ jyoti/ crompton /ABB coupled by means of tyre coupling on a common base plate with N.R valve, sluice valve rating PN- 1, ISI marked , foot valve, pressure gauge etc. all complete. | - | SET | - | - |
| 2 | Cost towards supply and fitting 25 H.P fully automatic air break star delta starter , Make- L&T /Havell’s/ Siemens / Schneider / BCH | - | EACH | - | - |
| 3 | Cost towards replacement of damaged parts of panel by new supply and fitting 100 amp T.P.N DTH MCCB-1no incoming feeder and 63 amp T.P.N DTH MCCB-3 nos. outgoing ,0 to500v voltmeter - 2 nos., 0to 100 amp ammeter-2 nos. with selector switch ,indicating lamp 3 Nos., making internal connection with copper wire etc. | - | EACH | - | - |
| 4 | Cost towards dismantling 2 no. 10 H.P C/F pump set with all accessories such as suction and delivery pipe line ,foot valve ,sluice & N.R valve, base plate etc ,including demolish old foundation -2 nos. for installation of new pump set, including keeping pump set in store or as per direction of E/I and throwing broken foundation outside the pump house including cost of labors , tools, tackles. | - | JOB | - | - |
| 5 | Cost towards making new P.C.C foundation with supplying stone chips, sand, cement, in the ratio 3:2:1 respectively about 5’x4’x3’for above pump sets including foundation bolts with nut and washer and curing plastering of foundation ,all complete . | - | JOB | - | - |
| 6 | Supplying and laying of 35 mm sq. 1.1 K.V grade,3.5 core P.V.C insulated and sheathed armored Al. cable , make – polycab, havell’s /,KEI, ISI marked, | - | METRE | - | - |
| 7 | Cost towards doing cable socketing with Al lugs 35 mm sq. Al. cable | - | ENDS | - | - |
| 8 | Cost of supply & laying, commissioning of 3 core 16 mm² copper conductor cable 1.1 KV grade PVC insulated and PVC sheathed unarmored from panel to starter and starter to motor with lugs socketing, | - | METRE | - | - |
| 9 | Cost towards making chemical earthing as per I:E Rules ,etc. all complete. | - | JOB | - | - |
| 10 | Cost towards making suction & delivery pipe line with supply of 100 m.m dia. heavy duty M.S pipe 40 feet , 100 m.m dia. M.S flange- 6 nos. , 100 m.m dia. heavy duty M.S bend -2 nos., 75 m.m dia. heavy duty M.S pipe -10 ft., 75 m.m dia. heavy duty M.S flange -6 nos. 75 m.m dia. heavy duty M.S bend -2 nos including cutting welding , required nut bolts, washer, rubber insertion, testing on load , all complete . | - | JOB | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_152410.xls
BOQ • 0.24 MB
TC.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid