Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹1.1 Cr+₹41,766 (0.39%)Accepted-Finance | ₹1.1 Cr+₹41,766 (0.39%) | L2 | Accepted-Finance L2 Bidder |
Tender Value
₹1.1 Cr
EMD Value
₹63,500
Closing Date
17 Dec 2024, 12:30 pmClosed
Inspector
ARULMIGU VEERATESWARAR THIRUKOIL AT ERUMPOONDI IN KILPENNATHUR TALUK OF TIRUVANNAMALAI DISTRICT.
REPAIRS AND RENOVATION OF ARULMIGU VEERATESWARAR THIRUKOIL AT ERUMPOONDI IN KILPENNATHUR TALUK OF TIRUVANNAMALAI DISTRICT.
2024_HRCE_503870_1
13/2024-2025
Open Tender
Civil Works
Lump-sum
ERUMPOONDI IN KILPENNATHUR TALUK
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹63,500
9 Jan 2025
22 Nov 2024
17 Dec 2024
22 Nov 2024
17 Dec 2024
22 Nov 2024
Amount
Removal of Plain Cement Concrete over stone Flooring clearing carefully away and racking out joints 20 mm deep and dressing one line etc.,complete complying with standard specification and as directed by the departmental officers
Removal of white /colour washers at inner & outer veneer and inner ceiling pavukkal using water blast by giving minimum presuure without affecting carvings & minute designs etc.,complete complying with standard specification and as directed by the departmental officers
Filling with earth other than sand atlow lying area of northern side inner eastern praharam as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Providing stone ware pipe 100 mm dia with stone ware bend on its end to dispose the water to outer yard from neerazhipaththi etc., complete complying with standard specification and as directed by the departmental officers
Supplying and fixing teak wood false ceilling at the moolasthanam by providing wooden rafters,planks and left opening with door at the north eastern corner with wind appliances and locking arrangements including labour charges for wrought and put up and removing scaffolding varnishing etc., complete complying with standard specification and as directed by the departmental officers
Racking out joints mannualy squeezing out without damaging the edges and re-pointing with special grinding lime mortar 1:1.5( one of lime and one & half of sand ) to inner & outer veneer and pavukkal including labour charges etc., complete complying with standard specification and as directed by the departmental officers
Disasemble and reassemble the cut stone outer and inner side and refixing the cut stone flooring area over a existing bed of brick jelly concrete in lime mortar 1:1.5 (One of lime & one and half of sand) and pointing the stone joints with same lime mortar 1:1.5(One of lime & one and half of sand) including dressing charges , curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying & Paving flooring with new cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and all surface single lime dressed as directed by the departmental officers and pointing with special grinding lime Mortar 1:1.5 ( one of lime and one & half of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)
Supplying & fixing well seasoned Teak wood temple type ornamental door in various sizes and required height with 2'' minimum and 7'' maximum thick ornamental frames as per approved palns and design including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications and as directed by the departmental officials
Dismantling, clearing away for any thickness of walls Brick Masonry in lime mortar walls including providing necessary supports to the ceiling stand and collecting ,conveying the debris etc., complete complying with standard specification and as directed by the departmental officers
under 3.0 m height
above 3.0 m height
Disassembling of stone Pavukkal ,Uthiram,Beam,Prasthara course stones at inner & outer to bringing them down after numbering them and conveying and stacking them properly for reuse including erecting,dismantling providing scaffolding etc., complete complying with standard specification and as directed by the departmental officers
Light stones
Heavy stones
Supply of newcut stones blocks (1 1/2' X 1 1/2' X 10') for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures upto 10 feet length including conveyance charges etc., complete complying with standard specification and as directed by the departmental officers
Labour charges for 3 line palamunai fully dressing of new cut stone varivargam of pathavari including fixing all the sides are machine cutting, top surface is neatly fully dressed and pointing with lime mortar 1:1.5 ( One of lime and one & half of sand ) including all materials.etc., with conveyance charges complete complying with standard specification and as directed by the departmental officers
Re-fixing the old stone members pointing with lime mortar 1:1.5( One of lime & one and half of sand ) including all labour charges etc., complete complying with standard specification and as directed by the departmental officers
Fixing old outer & inner veneer stones including pointing with lime mortar 1:1.5( One lime & one and half of sand ) etc., complete complying with standard specification and as directed by the departmental officers
Labour charges for 3 line palamunai dressing and fixing of new cut stone pavukkal etc complete complying with standard specification and as directed by the departmental officers.
Labour for cutting & sizing the 3 in one bothiyal to replace the broken one including cost of stone and dressing & fixing charges etc complete complying with standard specification and as directed by the departmental officers.
Providing lime Concrete 1:2:4 (One lime, two crushed stone sand and four hard broken stone jelly) using 12 mm gauge hard broken granite stone jelly for filleting gaps,including labour charges well rammed, consolidated and curing etc complete complying with standard specification and as directed by the departmental officers.
Core filling with Lime Concrete 1:2:4 ( One lime ,two sand and four stone jelly ) using with 12 mm gauge HGBS jelly with Lime as directed using lime and clearing away from the inner yard etc. complete complying with standard specification and as directed by the departmental officers.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete complying with standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles(flat tiles ) of size 150mm x 150mm x 12mm of approved quality set in lime Mortar 1:1.5 (One lime and one & half Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Grouting the brick joints of wall portion using hand pressure using lime mortar 1:1.5 (One lime and one & half sand )mixed with an extract of gallnut & palm jaggery and persisting joints with bricks using same lime mortar etc complete complying with standard specification and as directed by the departmental officers.
Plastering the inner & outer walls of sub -shrines at praharamandapam with lime mortar 1:1.5 (one lime and one & half sand )as per the existing style,and including erecting,dismantling of scaffolding , curing etc complete complying with standard specification and as directed by the departmental officers.
Re-construction of core wall using brick in lime mortar 1:1.5 ( one of lime and one & half of sand )using country bricks of size 8 3/4"X 4 1/4" X 2 3/4" mending with existing one including curing ,neat finishing etc complete complying with standard specification and as directed by the departmental officers.
Providing 8 mm Acrylic sheet around neerazhipaththi using with m.s angle ISA 25X25X3 mm including fabrication charges ,labour charges for fixing etc., complete complying with standard specification and as directed by the departmental officers
Plastering with lime Mortar 1:1.5 (One lime and one & half Plastering sand), 12mm thick as finishing work of nandhi mandapamin all floors including erecting,dismantling of scaffolding , curing etc complete complying with standard specification and as directed by the departmental officers.
Water tightening the main shrine vimanam to a maximum height of 25 meters is approximately from ground level after scrapping out of dead and pealed off lime plaster,restoring the brick portion like chajja,mahanasi,nasi and ornamental floral design portionetc.,as per the available existing clues with similar type of special bricks and tiles with combination mortar 1:1:5 and applying very thin coat of special hand grinded mortar paste 1:1:5 over the base plastering including ,attending floral design colour making using red and yellow oxide,curing etc.,complete
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVCmesh coverings,providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection,maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers.5 m height.
SUB TOTAL
Kannan Construction (BID ID -1205885)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .