| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC | ₹30.9 L | L1 | Accepted-AOC Accept |
| 2 | L2₹30.9 LRejected-Finance | ₹30.9 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Settu L1 | Ayub Constuctions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Alur HC BG ROAD km 0/0-0/281 | |||||
| 1.01 | Clearing the scrub jungles including all labour charges for all labour charges etc complete.km 0/281 | 200.95 | Sqm | - | - |
| 1.02 | Earthwork excavation and deposting on bank eith an intial lead and lift in hard gravelly soil as per SS 20B for foundationkm km 0/0-0/281 | 49.44 | Cum | - | - |
| 1.03Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading C | |||||
| 1.04 | Km 0/0-0/281 | 79.65 | Cum | - | - |
| 1.05Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 90 mm to 22.40 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | |||||
| 1.06 | Km 0/0-0/281 | 63.59 | Cum | - | - |
| 1.07Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer. | |||||
| 1.08 | Km 0/0-0/281 | 63.59 | Cum | - | - |
| 1.09Applying tack coat over WBM surface using 4 kg of bituminous emulsion per 10 sqm including cost and conveyance of bituminous emulsion which will be supplied by deptly at section store and cost of which will be recovered at the rates as per special condittion appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc, complete as per clause 503 of MOST specification | |||||
Tender Value
₹31.3 L
EMD Value
₹32,000
Closing Date
11 Dec 2018, 3:00 pmClosed
Block Development Officer
Tirukoilur
Improvements of 5 roads in Tirukoilur under FFCG 2018-19 in Viluppuram District Package 001
2018_RDTN_113014_1
B5/4085/2018/Tirukoilur/001
Open Tender
Civil Works
180 days
Villupuram Dist
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,000
Yes
25 Jan 2026
23 Nov 2018
11 Dec 2018
23 Nov 2018
11 Dec 2018
28 Nov 2018
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid