Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.2 L+₹38,211.34 (2.28%)Rejected-Finance NAN | L2 | Rejected-Finance L2 | |
| 3 | L3₹17.6 L+₹77,476.87 (4.62%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹19.7 L
EMD Value
₹39,440
Closing Date
3 Jul 2023, 11:00 amClosed
E.E. B.C.D.- 1, ORAI
E.E. B.C.D.- 1, ORAI
Reconstruction work of damaged Boundary of Khakal Inspection House under Betwa Canal Division I, Orai
2023_UPIDC_814760_9
N-21/BCD-1/1001, Date 13-06-2023
Open Tender
Civil Works
Item Rate
90 days
Reconstruction work of damaged Boundary of Khakal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹39,440
28 Jul 2023
28 Jun 2023
3 Jul 2023
28 Jun 2023
3 Jul 2023
28 Jun 2023
Amount
Cutting Heavy under growth and bushes upto 7.5cm.diameter including removal
Dismentaling of old and damaged brick masonary with cement/lime mortar.
Earth work in Mar Kabar rankar mixed soil for excacavtion foundation i/c all cost of labour materials and T&P etc.
Supplying and filling Coarse sand in Foundation including all cost of material labour and T&P etc.
Laying cement concrete (M-10) mix with 1:3:6 in foundation with proper compaction and curing including all cost material labour and T&P etc.required for proper completion of work
Centering and shuttering for R.C.C. work including all cost material labour and T&P etc.
Reinforcement for R.C.C. work i/c cutting, bending,&binding& placing in position including cost of material, labour, T& P etc.
R.C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.required for proper complitation work
Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc.
Brick work with 1:4 cement motar including all cost material labour and T&P etc. excluding cost of brick.
Cement concrete in all cost of materials and t&p 1:2:4 (M-15) cement : coarse sand : coarse aggregate in apron of inspection house and targhar including all cost of material,labour and T&P etc for proper completion of work.
12 mm thick cement mortar plaster in 1:4 (cement:sand) ratio including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.
Finishing exterior wall of i.h. boundary one priming coat & one coat oil distemper on new work including supply of all materials, labour and T&P etc. required for propper complition of the work
M/s Bajrang Construction & Suppliars
M/s Shrishti Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .