Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC HARYANA HR | GURUGRAM | HARYANA | 122502 | ₹7.4 L Quoted ₹7.2 L | L1 | Accepted-AOC Minimum rates |
| 2 | L2₹7.3 LRejected-Finance | ₹7.3 L | L2 | Rejected-Finance EMD Refunded |
| Sl No | Description | Qty | Unit | SAINI ELECTRICAL WORKS L2 | RINKU CHAUDHRI L1 |
|---|---|---|---|---|---|
| 1.00 | Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works.
Submersible Motor Upto 20 BHP
15.00 BHP x 1 No = 15.00 BHP
Total = 15.00 BHP x 12 = 180.00 | 15 | Per BHP Per Month | 120 ₹21,600 | 119 ₹21,420 |
| 2.00 | Submersible Motor More than 20 BHP
35.00 BHP x 1 No = 35.00 BHP
Total = 35.00 BHP x 12 = 420.00 | 35 | Per BHP Per Month | 120 ₹50,400 | 119 ₹49,980 |
| 3.00 | Horizontal Motor More than 20 BHP
25.00 BHP x 1 No = 25.00 BHP
40.00 BHP x 4 No = 160.00 BHP
60.00 BHP x 2 No = 120.00 BHP
75.00 BHP x 2 No = 150.00 BHP
Total = 455.00 BHP x 12 = 5460.00 | 455 | Per BHP Per Month | 120 ₹6.6 L | 119 ₹6.5 L |
Tender Value
₹7.4 L
EMD Value
₹14,740
Closing Date
9 Feb 2026, 3:00 pmClosed
SAMEER SHARMA
Panchkula PHED
Repair of pumping machinery of existing 2 No Tubewels and 5 No Booster of Block Morni and all other works contingent thereto For One Year Under Sub Division Pinjore Kambala
2026_HRY_500185_1
2026047410C4 07AA 44BB 9319 D86DF50B88E8547PUH
Open Tender
Civil Works
365 days
BHOJ JABYAL BHOJ KOTHI BHOJ PLASRA BHOJ PLASRA
2 documents required · 2 mandatory
₹1,000
Yes
₹14,740
Yes
13 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works. Submersible Motor Upto 20 BHP 15.00 BHP x 1 No = 15.00 BHP Total = 15.00 BHP x 12 = 180.00
Submersible Motor More than 20 BHP 35.00 BHP x 1 No = 35.00 BHP Total = 35.00 BHP x 12 = 420.00
Horizontal Motor More than 20 BHP 25.00 BHP x 1 No = 25.00 BHP 40.00 BHP x 4 No = 160.00 BHP 60.00 BHP x 2 No = 120.00 BHP 75.00 BHP x 2 No = 150.00 BHP Total = 455.00 BHP x 12 = 5460.00
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_578789.xls
BOQ • 0.27 MB
3C21BYZ149793.pdf
Additional Documents • 2.04 MB
Download all tender documents and submit your bid